Series CR Installation Manual PDF - Myers Power Products, Inc.
Series CR Installation Manual PDF - Myers Power Products, Inc.
Series CR Installation Manual PDF - Myers Power Products, Inc.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Location Guidelines:<br />
CAUTION<br />
• Choose a permanent location for the unit. Attempting to move them after you have<br />
installed the batteries can damage the batteries and the cabinet.<br />
This equipment is heavy. Refer to Table 3.4 when you choose a site to make sure that the floor<br />
can support the weight of the system, the batteries, and any other necessary equipment.<br />
Table 3.4 System weight [in lbs. (kg)]<br />
System Models for 90 Minute run time<br />
Unit with Standard<br />
SLC Batteries<br />
Unit without<br />
Batteries<br />
Single Phase<br />
Three Phase<br />
3.0kw 4.0kw 5.0kw 6.5kw 8.0kw 4.0kw 5.0kw 6.5kw 8.0kw<br />
1545<br />
(696)<br />
805<br />
(362)<br />
1693<br />
(763)<br />
805<br />
(362)<br />
1990<br />
(896)<br />
805<br />
(362)<br />
2285<br />
(1029)<br />
805<br />
(362)<br />
2580<br />
(1162)<br />
805<br />
(362)<br />
1693<br />
(763)<br />
805<br />
(362)<br />
1990<br />
(896)<br />
805<br />
(362)<br />
2285<br />
(1029)<br />
805<br />
(362)<br />
2580<br />
(1162)<br />
805<br />
(362)<br />
11<br />
114306E—Install/User <strong>Manual</strong>