12.03.2015 Views

Series CR Installation Manual PDF - Myers Power Products, Inc.

Series CR Installation Manual PDF - Myers Power Products, Inc.

Series CR Installation Manual PDF - Myers Power Products, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Location Guidelines:<br />

CAUTION<br />

• Choose a permanent location for the unit. Attempting to move them after you have<br />

installed the batteries can damage the batteries and the cabinet.<br />

This equipment is heavy. Refer to Table 3.4 when you choose a site to make sure that the floor<br />

can support the weight of the system, the batteries, and any other necessary equipment.<br />

Table 3.4 System weight [in lbs. (kg)]<br />

System Models for 90 Minute run time<br />

Unit with Standard<br />

SLC Batteries<br />

Unit without<br />

Batteries<br />

Single Phase<br />

Three Phase<br />

3.0kw 4.0kw 5.0kw 6.5kw 8.0kw 4.0kw 5.0kw 6.5kw 8.0kw<br />

1545<br />

(696)<br />

805<br />

(362)<br />

1693<br />

(763)<br />

805<br />

(362)<br />

1990<br />

(896)<br />

805<br />

(362)<br />

2285<br />

(1029)<br />

805<br />

(362)<br />

2580<br />

(1162)<br />

805<br />

(362)<br />

1693<br />

(763)<br />

805<br />

(362)<br />

1990<br />

(896)<br />

805<br />

(362)<br />

2285<br />

(1029)<br />

805<br />

(362)<br />

2580<br />

(1162)<br />

805<br />

(362)<br />

11<br />

114306E—Install/User <strong>Manual</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!