14.03.2015 Views

GOES-R MANAGEMENT CONTROL PLAN (MCP)

GOES-R MANAGEMENT CONTROL PLAN (MCP)

GOES-R MANAGEMENT CONTROL PLAN (MCP)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CITRB<br />

I - PSR<br />

GSFC<br />

ASM<br />

PDRR<br />

PMC<br />

C - GRR<br />

KDP<br />

I<br />

(DOC)<br />

KDP<br />

IA<br />

(DOC)<br />

C - GRR<br />

I-PSR<br />

KDP<br />

II<br />

Program<br />

Baseline<br />

(NOAA)<br />

PMC<br />

C-GRR<br />

Acquisition and Operations<br />

Final Design<br />

& Fabrication<br />

PGR-III<br />

Mission<br />

Integration<br />

Readiness<br />

(NOAA DUS)<br />

C-GRR<br />

System Assembly,<br />

Integration & Test<br />

PGR-IV<br />

Mission<br />

Readiness<br />

Board<br />

(NOAA DUS)<br />

MRR<br />

C- GRR<br />

Launch /<br />

Operations<br />

C-GRR<br />

PGR-V<br />

Handover<br />

Review<br />

(NESDIS)<br />

Disposal<br />

Program<br />

Gateway<br />

Reviews<br />

(PGR)<br />

Legend<br />

R-Series Review<br />

Single Satellite Review<br />

NESDIS<br />

PER - B<br />

Concept<br />

Design<br />

(NESDIS)<br />

PER-C<br />

Project<br />

Baseline<br />

(NOAA DUS)<br />

PER-D<br />

Integration<br />

Readiness<br />

(NESDIS)<br />

PER-E<br />

Launch<br />

Readiness<br />

(NESDIS)<br />

PER-F<br />

End of<br />

Mission<br />

(NESDIS)<br />

Project<br />

Entrance<br />

Reviews<br />

(PER)<br />

SCR<br />

SRR<br />

SDR<br />

PDR<br />

SIR<br />

CDRMORFOR<br />

PSR<br />

ORR<br />

SMSR<br />

FRR<br />

LRR<br />

PLAR<br />

System<br />

Milestones<br />

ACRONYMS<br />

ARB Acquisition Review Board FOR Flight Operations Review <strong>MCP</strong> Management Control Plan PDR Preliminary Design Review SCR System Concepts Review<br />

ASM Acquisition Strategy Mtg FRR Flight Readiness Review MDR Mission Definition Review PDRR Program Definition and Risk Reduction SDR System Definition Review<br />

CITRB Commerce IT Review Board I-PSR<br />

Independent Review Team<br />

Program Status Review<br />

MOR Mission Operations Review PLAR Post Launch Assessment Review SIR System Integration Review<br />

CDR Critical Design Review KDP Key Decision Point MRR Mission Readiness Review PER Pre-Environmental Review SMSR Safety and Mission Success Review<br />

C-GRR GSFC CMC Gateway Readiness Review LRR Launch Readiness Review ORR Operational Readiness Review PSR Pre-Shipment Review SRR System Requirements Review<br />

Figure 9: <strong>GOES</strong>-R Assessment Reviews and Milestones<br />

Page 25 of 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!