GOES-R MANAGEMENT CONTROL PLAN (MCP)
GOES-R MANAGEMENT CONTROL PLAN (MCP)
GOES-R MANAGEMENT CONTROL PLAN (MCP)
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CITRB<br />
I - PSR<br />
GSFC<br />
ASM<br />
PDRR<br />
PMC<br />
C - GRR<br />
KDP<br />
I<br />
(DOC)<br />
KDP<br />
IA<br />
(DOC)<br />
C - GRR<br />
I-PSR<br />
KDP<br />
II<br />
Program<br />
Baseline<br />
(NOAA)<br />
PMC<br />
C-GRR<br />
Acquisition and Operations<br />
Final Design<br />
& Fabrication<br />
PGR-III<br />
Mission<br />
Integration<br />
Readiness<br />
(NOAA DUS)<br />
C-GRR<br />
System Assembly,<br />
Integration & Test<br />
PGR-IV<br />
Mission<br />
Readiness<br />
Board<br />
(NOAA DUS)<br />
MRR<br />
C- GRR<br />
Launch /<br />
Operations<br />
C-GRR<br />
PGR-V<br />
Handover<br />
Review<br />
(NESDIS)<br />
Disposal<br />
Program<br />
Gateway<br />
Reviews<br />
(PGR)<br />
Legend<br />
R-Series Review<br />
Single Satellite Review<br />
NESDIS<br />
PER - B<br />
Concept<br />
Design<br />
(NESDIS)<br />
PER-C<br />
Project<br />
Baseline<br />
(NOAA DUS)<br />
PER-D<br />
Integration<br />
Readiness<br />
(NESDIS)<br />
PER-E<br />
Launch<br />
Readiness<br />
(NESDIS)<br />
PER-F<br />
End of<br />
Mission<br />
(NESDIS)<br />
Project<br />
Entrance<br />
Reviews<br />
(PER)<br />
SCR<br />
SRR<br />
SDR<br />
PDR<br />
SIR<br />
CDRMORFOR<br />
PSR<br />
ORR<br />
SMSR<br />
FRR<br />
LRR<br />
PLAR<br />
System<br />
Milestones<br />
ACRONYMS<br />
ARB Acquisition Review Board FOR Flight Operations Review <strong>MCP</strong> Management Control Plan PDR Preliminary Design Review SCR System Concepts Review<br />
ASM Acquisition Strategy Mtg FRR Flight Readiness Review MDR Mission Definition Review PDRR Program Definition and Risk Reduction SDR System Definition Review<br />
CITRB Commerce IT Review Board I-PSR<br />
Independent Review Team<br />
Program Status Review<br />
MOR Mission Operations Review PLAR Post Launch Assessment Review SIR System Integration Review<br />
CDR Critical Design Review KDP Key Decision Point MRR Mission Readiness Review PER Pre-Environmental Review SMSR Safety and Mission Success Review<br />
C-GRR GSFC CMC Gateway Readiness Review LRR Launch Readiness Review ORR Operational Readiness Review PSR Pre-Shipment Review SRR System Requirements Review<br />
Figure 9: <strong>GOES</strong>-R Assessment Reviews and Milestones<br />
Page 25 of 75