10.3 Wallops Ground Facility<br />

For Wallops, space for up to 10 <strong>GOES</strong>-R Program/Ops Project staff members (government/contractors)<br />

will be required during the A&O Phase of the GS implementation.<br />

10.4 Back-up ground facility<br />

At the Back-up Ground Facility up to 20 <strong>GOES</strong>-R Program/Ops Project staff members<br />

(government/contractors) will require office space during the A&O Phase of the GS implementation. The<br />

staff member requirement depends on the level of back up functionality approved for the facility.<br />

Operational spaces will be required to house back-up ground systems. Facilities for the Back-up Ground<br />

Facility will be acquired in accordance with the CFR 41 Chap 101 Public Contracts and Property<br />

Management, and relevant NOAA regulations.<br />

Page 59 of 75