GOES-R MANAGEMENT CONTROL PLAN (MCP)

GOES-R MANAGEMENT CONTROL PLAN (MCP)

GOES-R MANAGEMENT CONTROL PLAN (MCP)

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fiscal Year<br />

Program / System<br />

Spacecraft*<br />

Launch Vehicle<br />

Testing and Dependencies*<br />

Simulators*<br />

Instrument - ABI (ITT)<br />

Instrument - SEISS (ATC)<br />

Instrument - EXIS (LASP)*<br />

Instrument - SUVI (LMSSC)*<br />

Instrument - GLM*<br />

Ground Segment*<br />

Mission Management*<br />

Product Generation*<br />

Product Distribution*<br />

Enterprise Management*<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16<br />

Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1<br />

FRR<br />

<strong>GOES</strong>-R<br />

<strong>GOES</strong>-S<br />

KDP I<br />

SDR<br />

PDR<br />

KDP II<br />

CDR<br />

MOR SIR<br />

ORR<br />

MRR LRD<br />

IOC<br />

Launch<br />

9/07<br />

2/08 8/09<br />

7/10<br />

11/10<br />

7/11<br />

7/12 8/12<br />

6/14<br />

11/14<br />

6/15<br />

4/16<br />

12/14<br />

A&O RFP<br />

CA<br />

SDR<br />

PDR<br />

CDR<br />

Integration Complete<br />

PER<br />

PSR<br />

Slack<br />

Launch Processing<br />

8/07<br />

2/08 12/08<br />

4/09<br />

4/10<br />

4/11<br />

8/12<br />

4/13<br />

2/14<br />

8/14 11/14<br />

Begin LTSO<br />

Competition<br />

ATP<br />

Pre-VOS FRR<br />

SDR<br />

PDR<br />

6/07<br />

6/08<br />

6/11<br />

6/12<br />

10/14 11/14<br />

---------------------- AWG Algorithms ----------------------<br />

-------- End-to-End Tests --------<br />

Draft<br />

80%<br />

100%<br />

Update<br />

1<br />

2<br />

3<br />

4<br />

5<br />

7/08<br />

7/09<br />

7/10<br />

7/11<br />

12/12<br />

3/13<br />

6/13<br />

12/13<br />

9/14<br />

2/09 Factory Initial<br />

5/11<br />

NSOF #1<br />

5/12<br />

Algorithm<br />

PTM<br />

FM-1<br />

FM-2<br />

2/09<br />

10/09<br />

10/10<br />

10/11<br />

CDR & Algorithm<br />

FM-1<br />

FM-2<br />

7/09<br />

3/11<br />

3/12<br />

WCDAS NSOF #2<br />

Factory to RBU<br />

12/12<br />

12/13<br />

CA<br />

PDR<br />

CDR & Algorithm<br />

FM-1<br />

FM-2<br />

5/07 8/07<br />

5/08<br />

5/09<br />

5/12<br />

5/13<br />

SDR<br />

PDR<br />

CDR & Algorithm<br />

FM-1<br />

FM-2<br />

5/07<br />

9/07 7/08<br />

7/09<br />

6/12<br />

6/13<br />

CA<br />

SDR<br />

PDR<br />

CDR & Algorithm<br />

FM-1<br />

FM-2<br />

9/07<br />

12/07 5/08<br />

1/09<br />

4/10<br />

6/12<br />

6/13<br />

8/07<br />

Final RFP<br />

3/08<br />

CA SRR SDR<br />

2/09 5/09 7/09 PDR<br />

7/10<br />

CDR<br />

7/11<br />

Release MM<br />

8/12<br />

Release 1<br />

3/13<br />

Release 2<br />

10/13<br />

Launch<br />

Ready<br />

5/14<br />

ATO<br />

9/14<br />

T&C DB<br />

Ops<br />

SDR<br />

PDR<br />

Format CDR<br />

PSR<br />

Testing<br />

Launch Ready<br />

6/09<br />

4/10<br />

11/10 2/11 5/12<br />

2/14 4/14<br />

CDR<br />

SDR<br />

PDR<br />

CDR<br />

PDR Option<br />

PSR<br />

Option<br />

Launch Ready<br />

6/09<br />

6/10<br />

6/11<br />

3/12<br />

11/12<br />

3/13<br />

4/14<br />

Interface<br />

SDR<br />

PDR<br />

CDR<br />

PSR<br />

Tests<br />

Launch Ready<br />

7/09<br />

6/10<br />

6/11<br />

12/12<br />

6/13<br />

4/14<br />

SDR<br />

PDR<br />

CDR<br />

PSR<br />

Launch Ready<br />

7/09<br />

7/10<br />

7/11<br />

1/13<br />

5/14<br />

*Actual dates pending IBR<br />

ATO: Authority to Operate<br />

CA: Contract Award<br />

CDR: Critical Design Review<br />

FM: Flight Model<br />

FRR: Flight Readiness Review<br />

LRD: Launch Readiness Date<br />

LVRR: Launch Vehicle Readiness Review<br />

KDP: Key Decision Point<br />

MOR: Mission Operations Review<br />

MRR: Mission Readiness Review<br />

ORR: Operational Readiness Review<br />

PDR: Preliminary Design Review<br />

PER: Pre-Environmental Review<br />

PSR: Pre-Ship Review<br />

PTM: ProtoType Model<br />

SDR: System Definition Review<br />

SIR: System Integration Review<br />

Figure 12: <strong>GOES</strong>-R Program and Project Schedules<br />

Page 35 of 75