GOES-R MANAGEMENT CONTROL PLAN (MCP)
GOES-R MANAGEMENT CONTROL PLAN (MCP)
GOES-R MANAGEMENT CONTROL PLAN (MCP)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
This direction addresses all equipment that was purchased and/or provided by <strong>GOES</strong>-R/NESDIS for a<br />
contractor (Government-Furnished Equipment (GFE)). It also addresses all property purchased by a<br />
contractor at the direction of GSFC (Contractor Acquired Property (CAP)) that is retained as governmentowned<br />
equipment by <strong>GOES</strong>-R/NESDIS.<br />
5.5.1.1 GSFC Responsibilities<br />
The GSFC responsibilities for the <strong>GOES</strong>-R Program include the following:<br />
• Manage property at GSFC that is purchased with <strong>GOES</strong>-R funding for use by NASA or its<br />
support contractors in accordance with all applicable Federal Acquisition Regulations (FAR) and<br />
the NASA FAR Supplement (NFS)<br />
• Provide an annual inventory of all property at GSFC that is purchased with <strong>GOES</strong>-R funding for<br />
use by NASA or its support contractors. The inventory should include all mandatory element<br />
fields required to maintain the NOAA Property system. These fields are:<br />
o The Federal Supply Class<br />
o Property Identification Number<br />
o Manufacturer and model number<br />
o How it’s acquired (e.g., constructed, purchased, transferred)<br />
o From whom acquired<br />
o Acquisition cost<br />
o Acquisition date<br />
o Physical location.<br />
o Identify whether it is GFE or CAP<br />
o Optional fields include:<br />
• Model name<br />
• Source document number (purchase order, contract)<br />
• Serial number<br />
• Ensure that all applicable proper property clauses from the FAR and NFS are incorporated into<br />
any NASA <strong>GOES</strong>-R contract.<br />
• Ensure that each NASA <strong>GOES</strong>-R contractor provides the annual NASA Form 1018, Financial<br />
Reporting of NASA Property in the Custody of Contractors and that a copy is provided to the<br />
NESDIS Program Office.<br />
• Provide a list of any such property to the <strong>GOES</strong>-R Program Property Manager prior to any<br />
disposition of such property<br />
5.5.1.2 <strong>GOES</strong>-R/NESDIS Responsibilities:<br />
The NESDIS responsibilities for the <strong>GOES</strong>-R Program include the following:<br />
Notify GSFC property management organization of any property on the Inventory Schedule list of which<br />
they may want to take possession and provide shipping instructions.<br />
<strong>GOES</strong>-R/NESDIS may take possession of their property at any time under any circumstance, except that<br />
NASA shall have the opportunity to transfer data from computers prior to such action.<br />
-<br />
• Inform GSFC property management organization of any NOAA regulatory changes that may<br />
have an impact on property controls<br />
• Include the following mandatory internal data before inventory reports are sent to the NOAA<br />
Regional Property Manager for review: CBS ACCS, Property Accountability Officer, Property<br />
Custodial area, and Property Custodian<br />
• Record all property related to this project in the NOAA Personal Property System<br />
• Retain copies of all NOAA contract close out documents<br />
Page 52 of 75