Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Van Data Control Screens<br />
Data Field Explanation<br />
TG ML Enter valid alphanumeric code<br />
to indicate the tailgated mail<br />
class and load preparation.<br />
RS DESIRED <strong>The</strong> system displays a Y in this<br />
field. If a routing slip is desired,<br />
leave the Y. If a routing slip is<br />
not desired, key N.<br />
NOTIFICATION<br />
TIME<br />
MAILER<br />
PRELOAD<br />
Enter the time and date the<br />
supplier was notified that the<br />
van was ready for shipment.<br />
On C and G segment<br />
contracts, data entry must be<br />
done at least 4 hours prior to<br />
ramp cut<strong>of</strong>f time (as shown<br />
in RAMP TM: fields) or the<br />
system considers the shipment<br />
for the next day’s dispatch.<br />
Data entry cannot be done<br />
more than 48 hours after<br />
notification time.<br />
If C or G segments do not<br />
operate the next day, select<br />
the A segment contract.<br />
Two five-character fields<br />
(optional). If warranted, use<br />
valid <strong>RMIS</strong> codes to indicate<br />
that a van was preloaded from<br />
as many as two mailers.<br />
<strong>Handbook</strong> <strong>PO</strong>-<strong>505</strong> | May 2007 27