Important Reports<br />

<strong>RMIS</strong> produces many important management<br />

reports. <strong>The</strong> following paragraphs identify <strong>RMIS</strong><br />

reports that are indispensable for managing<br />

equipment and service and preventing manual<br />

payments. <strong>The</strong>se reports must be reviewed regularly<br />

to ensure correct use <strong>of</strong> supplier trailers, timely<br />

movement <strong>of</strong> mail, proper management <strong>of</strong> detention<br />

costs, and accurate <strong>RMIS</strong> data entry.<br />

Report LAB130P1, Scheduled Facility Arrival<br />

<strong>The</strong> purpose <strong>of</strong> the daily LAB130P1 report is to notify<br />

the destination facility <strong>of</strong> all rail intermodal units that<br />

are in transit and the planned arrival date. LAB130P1<br />

generates automatically once each day.<br />

<strong>Management</strong> <strong>of</strong>fices must use LAB130P1 to monitor<br />

in-transit dispatches and ensure each load arrives<br />

at the destination facility as intended and no load<br />

is misrouted or missing. LAB130P1 is also used to<br />

identify inbound volume, to ensure transportation<br />

suppliers deliver within the <strong>RMIS</strong> transit window to<br />

the destination facility as instructed by the Postal<br />

Service dispatch <strong>of</strong>fice, and to easily identify loads<br />

that are more than 24 hours overdue. Offices must<br />

promptly and continuously follow up to locate all<br />

overdue dispatches.<br />

<strong>Management</strong> <strong>of</strong>fices must also use LAB340P1,<br />

Detention/Van Hold At Other Facility, to bill private<br />

mailers for detention costs incurred by those facilities<br />

dispatching plant-load mail using intermodal rail<br />

service.<br />