Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Van Data Control Screens<br />
Data Field Command<br />
PLANNED DEST Van destination as entered<br />
on the AE screen. User may<br />
rekey a new destination code.<br />
If applicable, press key<br />
to select a scheme or press<br />
key to move to the next<br />
data field. If is pressed,<br />
key A under SEL on the<br />
scheme selection screen.<br />
LOAD<br />
COMPLETE<br />
Press key to accept<br />
the scheme. System then<br />
returns to the PL screen for<br />
further updates. <strong>The</strong> scheme is<br />
accepted when key is<br />
pressed.<br />
Enter the time and date that<br />
loading <strong>of</strong> van was completed<br />
(24-hour clock).<br />
MJ LD Enter valid alphanumeric code<br />
to indicate the majority mail<br />
class and load preparation<br />
(see Appendix C). When first<br />
position <strong>of</strong> MJ LD is zero,<br />
the EIRS map is presented<br />
for update after key is<br />
pressed. (See Appendix G for<br />
EIRS equipment codes.)<br />
PERC LOAD Enter the number between<br />
001 and 100 that indicates the<br />
percent <strong>of</strong> the van’s load. All<br />
three positions must be filled.<br />
<strong>Handbook</strong> <strong>PO</strong>-<strong>505</strong> | May 2007 34