17.11.2012 Views

Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU

Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU

Handbook PO-505 - The ABC's of RMIS II Rail Management - APWU

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Van Data Control Screens<br />

Data Field Command<br />

PLANNED DEST Van destination as entered<br />

on the AE screen. User may<br />

rekey a new destination code.<br />

If applicable, press key<br />

to select a scheme or press<br />

key to move to the next<br />

data field. If is pressed,<br />

key A under SEL on the<br />

scheme selection screen.<br />

LOAD<br />

COMPLETE<br />

Press key to accept<br />

the scheme. System then<br />

returns to the PL screen for<br />

further updates. <strong>The</strong> scheme is<br />

accepted when key is<br />

pressed.<br />

Enter the time and date that<br />

loading <strong>of</strong> van was completed<br />

(24-hour clock).<br />

MJ LD Enter valid alphanumeric code<br />

to indicate the majority mail<br />

class and load preparation<br />

(see Appendix C). When first<br />

position <strong>of</strong> MJ LD is zero,<br />

the EIRS map is presented<br />

for update after key is<br />

pressed. (See Appendix G for<br />

EIRS equipment codes.)<br />

PERC LOAD Enter the number between<br />

001 and 100 that indicates the<br />

percent <strong>of</strong> the van’s load. All<br />

three positions must be filled.<br />

<strong>Handbook</strong> <strong>PO</strong>-<strong>505</strong> | May 2007 34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!