10.07.2015 Views

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STATUS OF THIS DOCUMENTThis document has been produced by the Office of the Appeals Convenor as an electronic version ofthe original Statement for the proposal listed below as signed by the Minister <strong>and</strong> held by this Office.Whilst every effort is made to ensure its accuracy, no warranty is given as to the accuracy orcompleteness of this document.The State of Western Australia <strong>and</strong> its agents <strong>and</strong> employees disclaim liability, whether in negligenceor otherwise, for any loss or damage resulting from reliance on the accuracy or completeness of thisdocument.Copyright in this document is reserved to the Crown in right of the State of Western Australia.Reproduction except in accordance with copyright law is prohibited.Published on 18 August 2009 Statement No 801STATEMENT THAT A PROPOSAL MAY BE IMPLEMENTED(PURSUANT TO THE PROVISIONS OF THEENVIRONMENTAL PROTECTION ACT 1986)FREMANTLE PORTS INNER HARBOUR AND CHANNEL DEEPENING,RECLAMATION AT ROUS HEAD AND OFFSHORE PLACEMENT OF DREDGEDMATERIALProposal:The proposal is to deepen the <strong>Fremantle</strong> <strong>Inner</strong> <strong>Harbour</strong>,Entrance <strong>Channel</strong> <strong>and</strong> the Deep Water <strong>Channel</strong> by dredgingapproximately 3.1 million cubic metres to provide for furtherreclamation at Rous Head of approximately 27 hectares <strong>and</strong> foroffshore disposal.The proposal is further documented in schedule 1 of thisstatement.Proponent:<strong>Fremantle</strong> <strong>Port</strong>sProponent Address: 1 Cliff Street, <strong>Fremantle</strong>, WA 6160Assessment Number: 1621Report of the Environmental Protection Authority: Report 1330The proposal referred to in the above report of the Environmental Protection Authority maybe implemented. The implementation of that proposal is subject to the following conditions<strong>and</strong> procedures:1 Proposal Implementation1-1 The proponent shall implement the proposal as documented <strong>and</strong> described inschedule 1 of this statement subject to the conditions <strong>and</strong> procedures of thisstatement.Published on:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!