Table 2: Summary of key proposal characteristicsElementDescriptionGeneralConstruction of a sea wall1000 m longReclamationApprox 27 ha at Rous HeadDredging <strong>Inner</strong> <strong>Harbour</strong>, from a depth of RL -13.0 m to a depth of RL -15.0 m LowWater Mark <strong>Fremantle</strong> (LWMF) Entrance <strong>Channel</strong> from depths of RL-13.2 to 13.4 m to depths betweenRL -16.0 m (LWMF) <strong>and</strong> RL -16.8m (LWMF) to provide adequatedepth for turning ships Deep Water <strong>Channel</strong> to a depth ofRL -16.5 m (LWMF) on straightsections <strong>and</strong> RL -18.0 m (LWMF) onbends, within an area of approx169haRelocation of dredged materials From the <strong>Inner</strong> <strong>Harbour</strong> (approx 0.9Mm3) <strong>and</strong> the inner section ofEntrance <strong>Channel</strong> (approx 1.1 Mm3)to Rous Head from the Deep Water <strong>Channel</strong>(approx 1.1 Mm3) to a proposedspoil ground located at Gage Roads(placement of approx 1.45 Mm3within an area of approx 150ha)Timing Dredging campaign to commence inNovember for 20-26 weeks.KeyM metresM3 cubic metresFigures1. <strong>Fremantle</strong> <strong>Port</strong>s project location2. <strong>Fremantle</strong> <strong>Port</strong>s project location – Satellite3. <strong>Fremantle</strong> <strong>Port</strong>s project location – <strong>Inner</strong> <strong>Harbour</strong> dredging <strong>and</strong> reclamation4. <strong>Fremantle</strong> <strong>Port</strong>s project location – Rous Head extension7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!