10.07.2015 Views

Download full document - MiDA Ghana

Download full document - MiDA Ghana

Download full document - MiDA Ghana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Upgrading of N1 Highway Between Tetteh Quarshie Interchange and Mallam Road Junction, Accra, <strong>Ghana</strong>.Resettlement Action Plan (RAP), Lot 2• Resettlement Area Assessment: Identification of areas for relocation of affectedindividual residences, business owners and various categories of vendors (where theyare available) to recommend possible relocation or supplemental remedial measures.1.6 METHODOLOGY1.6.1 Studies Undertaken for RAPFor the assumptions underpinning this Resettlement Action Plan, several studies and activitieswere carried out which comprised of the following:• Assessment of project <strong>document</strong>s• Census and socio-economic survey• Institutional identification and capacity assessment of agencies• PAP asset inventory and valuation• Community physical infrastructure inventory• Investigation of Alternative Sites• Resettlement area assessment• Participatory program assessment• Primary data collection• Data collation and analysis1.6.2 Assessment of Project DocumentsA number of <strong>document</strong>s were obtained from various organizations including <strong>MiDA</strong>, and othergovernment agencies. These <strong>document</strong>s helped to set the project within the relevantbackground. They included the following:• Millennium Challenge Compact• MCC Guidance on the Implementation of Resettlement Activities• MCC Gender Policy• MCC Environmental Guidelines• Resettlement Policy Framework by Ministry of Transportation• The 1992 Constitution• State Lands Act (1962) Act 125• Administration of Lands Act (1962) Act 123• Public Conveyance Act (1965)• Lands Statutory Wayleaves Act (1963) Act 1861.6.3 Census and Socio-Economic SurveyA listing of all persons who own land, structures or live and work in the road corridor wasundertaken within the seventy-four (74), seventy-eight (78), eighty (80), eighty-two (82) meterROW for the intersections and ninety 90 meters for the interchange. In terms of project impact,these were the people likely to lose shelter, business premises and suffer other intangible8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!