10.07.2015 Views

Download full document - MiDA Ghana

Download full document - MiDA Ghana

Download full document - MiDA Ghana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Upgrading of N1 Highway Between Tetteh Quarshie Interchange and Mallam Road Junction, Accra, <strong>Ghana</strong>.Resettlement Action Plan (RAP), Lot 27.1.7 Summary of Estimated Supplemental AssistanceTABLE 7-8: SUMMARY F ESTIMATED SUPPLEMENTAL ASSISTANCESIDE OF ROAD SECTION 112+500 -14+125SECTION 28+600 – 12+500SECTION 36+000 – 7+500SECTIO 47+500 – 8+600LHS GH¢44,563.52 GH¢221,707.45 GH¢63,079.26 GH¢71,673.43RHSTOTAL(SECTION)GH¢105,428.71 GH¢313,237.75 GH¢70,194.58 GH¢143,671.39GH¢149,992.25 GH¢534,945.20 GH¢133,993.84 GH¢215,344.82GH¢1,034,276.11Report Volume II presents a Directory, Photos and Estimated Amount for SupplementalAssistance for PAPs with Temporary Structures.7.2 Immovable/Permanent Properties7.2.1 Type of Permanent PropertiesA permanent property as defined under this study consists of land with buildings, other civilworks and ground improvements thereon. Accordingly immovable/permanent properties to beaffected have been categorized into the following, Frontages that include:i. Fence wall only;ii. Fence wall and paved and/or landscaped grounds:Paved and/or landscaped Grounds only such as car parking areas, frontage of buildings,lawns/gardens:Also to be affected are:Building only:Building, with fence wall and with paved/landscaped grounds:Building with fence wall no paved grounds:Building with paved/landscaped grounds not fenced:Bare Grounds (Land only);Filling Stations; andOthers such as washing bays, concrete water reservoirs64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!