10.07.2015 Views

Download full document - MiDA Ghana

Download full document - MiDA Ghana

Download full document - MiDA Ghana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Upgrading of N1 Highway Between Tetteh Quarshie Interchange and Mallam Road Junction, Accra, <strong>Ghana</strong>.Resettlement Action Plan (RAP), Lot 2CHAPTER EIGHT8.0 IMPLEMENTATION PLANThis section outlines the RAP implementation plan. Given the limited time for RAPimplementation and construction, the RAP consultants worked closely with the engineeringdesign team to ensure that the RAP implementation was consistent with construction needswith five implementation sections. These implementation sections and chainages are detailedin Table 1-1 in the executive summary of this <strong>document</strong> repeated below in Table 8-1.Table 8-1:Implementation SectionsIMPLEMENTATION CHAINAGE COMPLETION DATE PROJECT-AFFECTED PERSONS:SECTIONMAJOR TYPES AND NUMBER1 12+500 – 30 th Sept 2009 869 (mostly business operators,14+119residents, house/land owners andpetty traders.2 8+600 – 23 rd Nov 2009 2,016 (mostly business operators,12+500apprentices, petty traders and3 6+000 –7+5004 7+500 –8+6005 (LOOP 5) 0+000 -0+200hawkers)26 th Jan 2010 1,015 (mostly business operators,hawkers, petty traders andapprentices)26 th Jan 2010 1,842 (mostly petty traders,business operators and hawkers.)3 rd Feb 2010 524 (mostly petty traders andbusiness operators.)Initial marking and referencing of the ROW was done by GHA and the Consultant’s Surveyor.The acquiring agencies (<strong>MiDA</strong> and GHA) showed the affected properties to the LVB. A jointreferencing done by a team comprising GHA and the Consultant’s surveyor and valuer validatedthe data already collected at the 3 intersections, and the Interchange at Mallam Junction. Thefinal valuation will be presented by LVB to its board for approval. LVB will submit anAssessment and Valuation Report to <strong>MiDA</strong> and will prepare offer letters for PAPs withproperties.Based on the experiences in Lot 1 of the N1, certain approaches will be used to facilitate theimplementation of the RAP. All PAPsare assigned unique identification numbers which can beused to identify them and for them to identify themselves in relation to their claim. Thisnumber will be given to them as part of the negotiations for them to present during thepayment of compensation. The picture and all data on each PAP will be printed on the73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!