10.07.2015 Views

Download full document - MiDA Ghana

Download full document - MiDA Ghana

Download full document - MiDA Ghana

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Upgrading of N1 Highway Between Tetteh Quarshie Interchange and Mallam Road Junction, Accra, <strong>Ghana</strong>.Resettlement Action Plan (RAP), Lot 2Vacation from ROW Vacation period for 1786PAPswithoutstructuresPAPs from atAbeka Lapaz, Akwetemanand Nii Boi TownVacation period for 53landed property owners inPAPs from at Abeka Lapaz,Akweteman and Nii BoiTown11/3/2009 12/4/200911/3/2009 1/26/2010Section 5 (Chainage +000-+200): This section covers Loop 5. A total of 40 property owners and484 non property owners will be met in this section.Table 8-1e Resettlement Implementation Period for PAPS: Section 5Resettlement Process Activities Start Date End dateNegotiations Meet 524 PAPs in Loop 5 8/31/2009 9/3/2009FeedbackPayment ofSupplemental AssistanceCompensation ofLanded PropertyVacation from ROWFeedback from PAPs in Loop59/10/2009 9/29/2009Payment of PAPsat Loop 5 9/1/2009 10/20/2009Payment to 40 landedproperty ownersVacation period for 484 PAPswithout structures PAPsfrom at Abeka Lapaz,Akweteman and Nii BoiTownVacation period for 40landed property owners inPAPs from at Abeka Lapaz,Akweteman and Nii BoiTown10/5/2009 11/10/200911/4/2009 12/4/200911/11/2009 2/3/201082

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!