11.07.2015 Views

World Air Ops | NAT | Doc 007 MNPS Guidance

World Air Ops | NAT | Doc 007 MNPS Guidance

World Air Ops | NAT | Doc 007 MNPS Guidance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Guidance</strong> concerning <strong>Air</strong> Navigation in and above the <strong>NAT</strong> <strong>MNPS</strong>A CHAPTER 16time periods and outside them. At specified times, some appropriate direction levels are in fact reserved foruse by the opposite direction traffic flows that then predominate. The current usage allocation of flight levelsin the <strong>NAT</strong> <strong>MNPS</strong>A is published in the UK and Canadian AIPs and shown at Attachment 6 as the <strong>NAT</strong>Flight Level Allocation Scheme (FLAS). Hence, pilots and planners should always consult the current AIPsand any supporting NOTAMs when flight planning random routes through <strong>NAT</strong> <strong>MNPS</strong> <strong>Air</strong>space. If a flightis expected to be level critical, operators should contact the initial OAC prior to filing of the flight plan todetermine the likely availability of specific flight levels.Mach Number16.4.2 In <strong>NAT</strong> <strong>MNPS</strong> <strong>Air</strong>space the Mach Number technique is used to manage longitudinalseparations between aircraft following the same track. Chapter 7 above provides more detailed information.Consequently, flight plans for the <strong>NAT</strong> <strong>MNPS</strong> segment of flight must define aircraft speed in terms of aMach Number. This is true even if procedures dictate that aircraft speed be defined in terms of TAS forother (continental airspace) segments of that same flight. Oceanic clearances include a True Mach Numberto follow and because this is used by ATC to regulate longitudinal separations, no tolerance is permissible.Consequently, <strong>NAT</strong> flights should not be planned or flown on the assumption that LRC or ECON fuelregimes may be used.16.5 ATC FPL Completion16.5.1 It is important that all of the foregoing conventions and protocols are adhered to whenplanning a flight through <strong>NAT</strong> <strong>MNPS</strong> <strong>Air</strong>space. Summarised guidance on the flight planning requirementsfor specific routes is given above at Paragraph 4.2. Correct completion and addressing of the filed ATCflight plan is extremely important. Non-observance of any of the foregoing <strong>NAT</strong> <strong>MNPS</strong> <strong>Air</strong>space planningprinciples, or even simple syntax errors in the filed FPL, can lead to delays in data processing and/or to thesubsequent issuing of clearances to the flights concerned. Despite the growing use of automated flightplanning systems a significant proportion of ATC Flight Plans submitted in respect of flights through theNorth Atlantic Region continue to contain errors. In some instances these errors are such that the Flight Planis rejected and the Operator is required to re-submit a corrected version. Full and detailed explanations ofhow to complete an ATS Flight Plan in respect of the <strong>NAT</strong> portion of a flight are shown at Attachment 4.This document highlights the more common completion errors that are made and includes example,correctly-completed-ICAO Flight Plans. New and/or infrequent North Atlantic operators are earnestlyrecommended to make diligent reference to this document. Furthermore it should be noted that a free texteditor is available on the Eurocontol website that can validate any proposed ICAO flight plan before filing.It will advise if a flight plan is acceptable for routes, altitudes and transitions. If the flight plan would berejected, this editor will describe what is wrong, thereby allowing the operator to repair it before filing.16.5.2 If filing via an OTS track, particularly during peak traffic periods, it must be appreciated thatATC may not be able to clear the aircraft as planned. ATC will, if possible, first offer a clearance on theplanned track but at a different Flight Level. If, however, no reasonable alternative level is available, or ifthe offered Flight Level is unacceptable to the pilot, then ATC will clear the aircraft via another OTS track.When filing the ATC Flight Plan, the Dispatcher may enter the details of such an acceptable alternative trackin Field 18 of the ICAO FPL. This will be taken into account by ATC if indeed having to clear the aircraftvia a route other than that planned.16.5.3 In order to signify that a flight is approved to operate in <strong>NAT</strong> <strong>MNPS</strong> <strong>Air</strong>space, the letter ‘X’shall be inserted, in addition to the letter ‘S’, within Item 10 of the flight plan. A ‘W’ must also be includedin Item 10 to indicate that the flight is approved for RVSM operations.16.5.4 For flights which also intend to operate through the WATRS Plus <strong>Air</strong>space RNP-10 or RNP-4 approval is required in order to benefit from 50NM lateral separation employed here. Any <strong>MNPS</strong>A aircraft<strong>NAT</strong> <strong>Doc</strong> <strong>007</strong> 94 Edition 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!