26.11.2012 Views

ManageEngine ADManager Plus :: Help Documentation

ManageEngine ADManager Plus :: Help Documentation

ManageEngine ADManager Plus :: Help Documentation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Scheduling Reports<br />

Overview<br />

<strong>ManageEngine</strong> <strong>ADManager</strong> <strong>Plus</strong> :: <strong>Help</strong> <strong>Documentation</strong><br />

This section would help you to schedule reports and perform effective schedule<br />

management. The topics covered are listed below:<br />

• Scheduling Reports<br />

• Scheduler Creation<br />

• Managing Schedules<br />

• Column Customization in Scheduled Reports<br />

Scheduling Reports<br />

You can schedule the reports generation by adhering to the steps mentioned below:<br />

• Select the AD Reports Tab.<br />

• Select the Schedule Reports link at the top right corner of the page.<br />

• Select the Schedule New Reports link at the top right corner to create a new<br />

schedule.<br />

Note: You will encounter a Pop up message if the Mail Server is not configured. You can<br />

do that using the Configure Mail Server Settings link to proceed further.<br />

• Specify the Scheduler Name and Description details.<br />

• Choose the appropriate Domain from the Select Domain list. Click on the Add<br />

OUs link, to specify the OUs for the Domain.<br />

Scheduler Creation<br />

The Scheduler creation enables you to create a schedule based on the three criteria<br />

mentioned below:<br />

1. Select Reports<br />

2. Schedule Duration<br />

3. Select Report Format<br />

4. Email Address to send Reports<br />

1. Select Reports- The Select Reports feature comprises of three sections<br />

• Click on the Report Type you want to schedule.<br />

• Select the reports from the Available Reports list. Enter the Input parameter<br />

details if asked for.<br />

• You can view the reports in the Selected Reports list.<br />

• Use the Remove link to eliminate any report from the selected list.<br />

2. Schedule Duration<br />

The time span of report generation can be set based on your requirements. The<br />

duration and time can be set with the following options:<br />

ZOHO Corp. 141

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!