26.11.2012 Views

ManageEngine ADManager Plus :: Help Documentation

ManageEngine ADManager Plus :: Help Documentation

ManageEngine ADManager Plus :: Help Documentation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

To disable a schedule,<br />

<strong>ManageEngine</strong> <strong>ADManager</strong> <strong>Plus</strong> :: <strong>Help</strong> <strong>Documentation</strong><br />

• Click the AD Reports Tab<br />

• Click the Schedule Report link to open the Schedule Reports page<br />

• You will find a list of Scheduled reports on this page.<br />

• Click on the Enable icon in the Action tab column, appropriate to the Scheduled<br />

Report you want to disable.<br />

• The Enable icon will be replaced by the Disable icon.<br />

To enable a schedule,<br />

• Click on the Disable icon in the Action tab column, appropriate to the Scheduled<br />

Report you want to enable<br />

• The Disable icon will be replaced by the Enable icon.<br />

Deleting a Schedule<br />

When a Schedule is no longer useful, you can delete it from the Schedule Reports list.<br />

To delete a schedule,<br />

• Click the AD Reports Tab<br />

• Click the Schedule Report link to open the Schedule Reports page<br />

• You will find a list of Scheduled reports on this page.<br />

• Click on the Delete icon in the Action tab column, appropriate to the Scheduled<br />

Report you want to delete.<br />

• The deleted Schedule will no longer be listed.<br />

Edit a Schedule<br />

You can make changes to the existing schedule as may be required using the Edit<br />

option.<br />

Follow the steps to edit a schedule:<br />

• Click the AD Reports Tab<br />

• Click the Schedule Report link to open the Schedule Reports page<br />

• You will find a list of Scheduled reports on this page<br />

• Click on the Edit icon in the Action tab column, appropriate to the Scheduled<br />

Report you want update.<br />

• You can make the changes in the Schedule Reports page.<br />

• Click on the UPDATE button to save the changes.<br />

• Click on the View scheduled tasks link to see the updated schedule in the list.<br />

Column Customization in Scheduled Reports(for <strong>Help</strong>Desk)<br />

<strong>Help</strong>Desk Technicians can also schedule report generation depending on the permissions<br />

of the <strong>Help</strong>Desk Role they belong to. The procedure to schedule report generation is the<br />

same as explianed in the previous section. While scheduling the reports, the <strong>Help</strong>Desk<br />

Technician can also customize the columns that need to appear in the report that is<br />

scheduled. So everytime, the schedular runs, the column settings applicable to that<br />

particular <strong>Help</strong>Desk Technician will be be applied.<br />

ZOHO Corp. 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!