12.07.2015 Views

6 - Association of Interior Specialists

6 - Association of Interior Specialists

6 - Association of Interior Specialists

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Partitioning system ancillaries 7Glass is marked with a level line on the opposite side <strong>of</strong> theMinimum zone <strong>of</strong> invisibilityglass with a spirit level, chalk line or laser level, to ensurethat the manifestation is straight and level once applied.Clean water and application solution are then used toapply the manifestation to the glass, taking care not to wet1500mm1500mm1600mm1400mmSecond levelany carpeting. The manifestation should not overlap siliconejoints or edges <strong>of</strong> glass.Once the graphics are dry and finished, any water marks500mm500mm 800mm 1155mm1000mm850mmFirst levelshould be cleaned <strong>of</strong>f. Graphics should not then be cleanedagain for 30 days.Visual inspection <strong>of</strong> graphics should be carried out fromthe side that the manifestation has been applied, from adistance <strong>of</strong> two metres.Figure 38Figure 36 Figure 37Glass doors and partitions will satisfy the requirementsproviding:• They are clearly defined with manifestation on the glassat two levels taken from the floor, 850mm to 1000mmand 1400mm to 1600mm, contrasting visually with thebackground seen through the glass (both inside andoutside) in all lighting conditions (see drawing below).Note: any manifestation or all over cover to doors shouldtake into account the requirements for minimum zones<strong>of</strong> visibility (see figures 36 and 37).• Manifestation takes the form <strong>of</strong> a logo or sign at least150mm high (repeated if on a glazed partition), or adecorative feature such as broken lines or continuousbands at least 50mm high (see figure 38).Note: where there appears to be a conflict between theguidance in Part M and Part N - Part M takes precedence.7.2.2 Manifestation application methodInstallation <strong>of</strong> manifestations should be carried out at theend <strong>of</strong> the project, when the site is clean and dust free.Glass should be cleaned thoroughly prior to application,taking care not to scratch the glass.150mm50mmManifestation (logos, patterns etc) mustcontrast visually with the backgroundseen through the glass in both naturaland artificial lightlogo logo logorepeated(no pitch is defined)repeated(no pitch is defined)or39

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!