12.07.2015 Views

PUC Annual Report–Fiscal Year 2004-05 - Public Utilities Commission

PUC Annual Report–Fiscal Year 2004-05 - Public Utilities Commission

PUC Annual Report–Fiscal Year 2004-05 - Public Utilities Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Public</strong> <strong>Utilities</strong> <strong>Commission</strong> <strong>Annual</strong> Report <strong>2004</strong>-<strong>05</strong>State of Hawaii Page 7090.00Figure 44HECO Customer Average Interruption Duration (CAID)(Lower is better)85.0080.0079.0675.00Minutes70.0065.0070.1667.4666.3660.0<strong>05</strong>5.0<strong>05</strong>0.0<strong>05</strong>7.592000 2001 2002* 2003 <strong>2004</strong>**<strong>Year</strong>*Data normalized to exclude 12/19/02 AES Load Shedding outage**Data normalized to exclude 1/14/04-1/15/04 High Winds, 2/26/04-2/28/04 Storm, and 3/3/04Pukele OutagesFigure 44 shows the CAID for <strong>2004</strong> ranked the worst in the past five (5) years inminimizing the time a customer was out of service. An increase in response times were noted forCable Failures (13 minutes), Equipment Deterioration (41 minutes) and High Winds (63 minutes)over the 2003 results.The average electrical outage duration (CAID) for <strong>2004</strong> was 79.06 minutes. Within thelast five (5) years, <strong>2004</strong> had the longest duration increase (CAID) with nearly 22 minutes over2003 results.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!