12.07.2015 Views

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

78NATO UNCLASSIFIED RELEASABLE TO THE PUBLICE.2 SARIRE.2 SARIRa. Date / Time Group of Report: Zb. Callsign: Last Contact Frequency:c. Aircraft type:d. Nationality / Unit:e. Persons on Board:f. Location:g. Location qualifiers (circle as appropriate): Actual / last known / estimated positionland / water ejection / bailout altitudefeeth. Ejection / bailout winds at knotsi. DTG of Incident Zj. Cause of loss (circle as appropriate):k. Interceptors, Surface to Air Missile (SAM), Anti Aircraft Artillery (AAA), collision,malfunction, other:l. Isolated personnel condition: Mobile?(a) Injured?(b) Concealed?(c) Survival equipment?(d) Signaling devices?(e) Intentions?m. Last voice contact at DTG. freq / push with(a) (Callsign)n. Threat situation:o. Friendly units on-scene:p. Source of information:q. Reported by:r. RMC call sign:E.3 PR 11-line reportThe following checklist is used to communicate basic information about a PR situation.As a minimum, the designated AMC uses this checklist to gather information and relayit to the Combined Air Operations Centre (CAOC), <strong>JPR</strong>C /PRCC, and the PRTF. All aircraftshould have this checklist available and use it as appropriate during a PR incident.NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!