12.07.2015 Views

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC<strong>JPR</strong>C / PRCC set-up checklists63(j) Transload locations(k) Helicopter Contact Points (HCPs) / waypoints(l) Fire support coordination line(m) Field hospitals(n) OPFOR / friendly forces(o) Airspace Control Measures (ACM)(p) Current as of Date / Time Group (DTG)l. Analyse the FRAGO for active operations areas (this analysis will be a major factorin determining if Forward Operating Location (FOL) activity is needed);m. Separate the FRAGO package into general SPINS, PR SPINS, PR frag missions, andgeneral frag missions;n. Set-up mission folders and miscellaneous worksheets;o. Set-up two message folders (incoming and outgoing). Divide the folders into classifiedand unclassified sections, with log sheets;p. Set-up a controller information file;q. Start, set-up procedures for maintaining a 24hr events log;r. Develop a work schedule;s. Develop a schedule for a mobile training team;t. As needed, review:(a) Authentication / encryption / decryption procedures(b) Plotting of UTM / georef coordinates(c) Plotting of Tactical Air Navigation (TACAN) radials and Distance MeasuringEquipment (DME) (SARDOT/Bullseye)(d) ATO / SPINS format and proceduresu. Transmit <strong>JPR</strong>C/<strong>JPR</strong>C activation messagev. Start and mission log.NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!