12.07.2015 Views

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

86NATO UNCLASSIFIED RELEASABLE TO THE PUBLICG.4 coordinating instructionsG.3.6<strong>JPR</strong>CPRCCTasksa. The <strong>JPR</strong>C is to develop and maintain a theatre PR SOP in accordance withATP-3.7.1 Vol ?? Annex H.b. The <strong>JPR</strong>C is to provide a PR in-brief as part of in-processing programme.c. Other tasks are as per ATP-3.7.1. A more extensive task-list may be insertedhere or as an appendix to Annex V if deemed appropriate.a. The PRCC is to develop and maintain a PR SOP for their component / sectorbased upon the theatre PR SOP in accordance with ATP-3.7.1 Vol ?? Annex H.b. The PRCC is to provide a PR in-brief as part of in-processing programme.c. Other tasks are as per ATP-3.7.1. A more extensive task-list may be insertedhere or as an appendix to Annex V if deemed appropriate.ACC. only if the ACC is the designated PR authority. If that authority rests with the acjfcor COM NPSO, the ACC responsibilities will be addressed in the item below.Land Component Commander (LCC)MCCSOCCSector commanders]a. ...Staffs from all branches at all levels are to be prepared to support the <strong>JPR</strong>C / PRCC toprepare plan and execute PR operations as per Allied Tactical Publication (ATP)-3.7.1 and PR SOP (theatre, component, sector).Troop contributing nations a. Ensure personnel assigned to have the appropriate level of SERE training as defined bypre-deployment requirements.b. Ensure all forces are equipped with required survival equipment as definedby pre-deployment requirementsc. Identify requirements for reintegration activities.G.4 coordinating instructionsAll personnel deployed in the JOA is to prepare an ISOPREP and an EPA. Units are to beprepared to forward ISOPREP and EPA to the PRCC / <strong>JPR</strong>C if required.G.5 PIERIEAll deployed personnel is to be considered to be Personnel Identified as at an ElevatedRisk of Isolation and / or Exploitation (PIERIE). Consequently, in accordance with NATOpolicy, sending nations and headquarters are to categorise their personnel with respectto their risk of isolation. This categorisation is typically done through the definition ofMRIE and HRIE. Preparation for a potential isolation event is conducted in three consecutivesteps; pre-deployment preparation, upon entry preparation, and normal missionpreparation.NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!