12.07.2015 Views

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

54NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC5.3 Pro-active planningb. Ensure appropriately qualified personnel staff the <strong>JPR</strong>C / PRCCs in accordance withParagraph 1.4.1. Manning of the PRCCs is a matter for the appropriate CCs, but,ideally, would reflect that of the <strong>JPR</strong>C. Additionally, the <strong>JPR</strong>C / PRCCs will needaccess to the intelligence, legal and admin and logs staff, dedicated SERE specialistsand Subject Matter Experts (SMEs) on the designated recovery assets. Dependingupon the scale and complexity of the operation the <strong>JPR</strong>C may need to include othercomponent Liaison Officers (LNOs).Establish and maintain command procedures for PR0508. To establish and maintain command procedures for PR, the PR planner will needto:a. Determine the command relationship for PR forces. Dedicated PR forces wouldnormally be under the ACC OPCON and he would exercise TACON of other forcesassigned for specific PR missions. Designated (double-hatted) forces would usuallyremain OPCON to their CC but should be identified during the planning process,ideally by phase. Supporting / supported relationships will be used to identifythe Component responsible for planning and executing each mission with thesupported Component exercising TACON over recovery assets for the period of themission. Authority to Launch and Execute PR missions should be clearly identifiedand promulgated. The command relationships for Non-conventional AssistedRecovery (NAR) missions will also need to be clarified although the details of theseareas should not be promulgated to those without a need to know.b. Ensure that the C 2 structure is publicised and understood. The C 2 structure willnormally be described in the PR SOP.0509. Establish clear and direct lines of communication between all force elements.Once it has been established what recovery assets will be operating from where, the InformationExchange Requirement (IER) needs consideration. The minimum equipmentis listed in Paragraph 1.4.2.Reintegration planning0510. The PR planner should ensure supporting reintegration plans are developed, promulgatedand implemented. This detail is often overlooked and rarely exercised so additionalstaff effort and liaison will be required to educate other staff functions. Full detailsof medical, welfare, administrative, and de-briefing requirements must be includedin theatre PR SOP and the PR planner should ensure that support to PR is included in thecorresponding combat service support plans.5.3.2 AO PR SOPGeneral0511. The Annex V and the theatre PR SOP are the main outputs of the PR OPP andprovide AO specific direction and guidance. They should contain the majority of standingPR information and enable content of PR SPINS to be minimised. There are no firm rulesfor how PR information is split between SPINS and PR SOP; the <strong>JPR</strong>C Director will need todecide the most appropriate means depending upon communications capability and theexpectations of the JFC, especially in a coalition environment. For guidance the templateformat is given in Annex H.NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!