12.07.2015 Views

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

Cover letter_JPR JOG_ACT approved - European Defence Agency

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PR SOP templateNATO UNCLASSIFIED RELEASABLE TO THE PUBLIC93H.2.1Not covered areasDespite the PR capabilities as mentioned above, some areas in the AO are not coveredby PR assets. List the areas as mentioned. These may be high mountains, areas undercontrol of hostile elements, etc. (e.g. there may not be PR capabilities available that canoperate at night).H.3 C2H.3.1PR C2 descriptionBased on the overall C 2 structure as described in the OPLAN Annex V, the PR C 2 structureis depicted in the diagram below. text is to be copied from the Annex V and expanded ifrequiredINSERT PR C2 GRAPHICFigure H.1: PR command and control structureH.3.2Supporting / supported relationshipstext is to be copied from the Annex V and expanded if requiredH.3.3Launch / Execute authority matrixtext is to be copied from the Annex V and expanded if requiredH.3.4ReportsThe <strong>JPR</strong>C will be notified of all PR operations. The PRIR will be used to transmit themessage. The PRCCs will submit an initial report to the <strong>JPR</strong>C prior to any planned ordeliberate PR missions. Lessons identified will be submitted to the <strong>JPR</strong>C as soon aspossible for all other PR missions. Mission folders will be archived upon the completionof the recovery.NATO UNCLASSIFIED RELEASABLE TO THE PUBLIC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!