12.07.2015 Views

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CH</strong>-<strong>TRAMPAC</strong> Document Rev. 2, May 2005testing methodology <strong>of</strong> the UFGTP. This methodology is consistent with that used in thedetermination <strong>of</strong> dose-dependent G values in Appendix 3.3 <strong>of</strong> the <strong>CH</strong>-TRU PayloadAppendices. 1Site implementation <strong>of</strong> the UFGTP long-term objective must be documented in site-specificprograms approved by DOE-CBFO.5.2.5.5.1 Required Data and Criteria for SubpopulationContainers that are identified by process knowledge or other characterization to have similarproperties with respect to gas generation are grouped into populations. The basis for groupingindividual containers into a population shall be documented (e.g., by item description codesshowing all containers are generated from the same waste stream). Within a given population, asubpopulation size may be determined and subjected to gas generation testing (i.e., measurementor container gas generation testing). The results <strong>of</strong> testing the subpopulation may be used tocalculate flammable gas generation properties for the remainder <strong>of</strong> the population. Thefollowing data for each container <strong>of</strong> the subpopulation (i.e., that has undergone gas generationtesting or measurement) shall be available:• Content code and shipping category, from which the maximum allowable FGGR isdetermined• Date <strong>of</strong> container closure, date <strong>of</strong> venting, and date <strong>of</strong> measurement or testing• Methane concentration (Section 5.2.5.3.1)• Flammable gas generation rate (Section 5.2.5.3.4 or 5.2.5.4)• Total gas generation rate for <strong>Waste</strong> Type IV (Section 5.2.5.4).5.2.5.5.2 Statistics for Required Subpopulation SizeContainers selected for evaluation (i.e., the subpopulation) must be representative <strong>of</strong> thepopulation with random or stratified sampling techniques used to avoid any bias in containerselection. The required subpopulation size to implement the long-term objective will becalculated through the following equation 5 :where,n 0nNn =1+n0( n −1)0N= A conservative subpopulation size for an infinite population for a confidencelevel <strong>of</strong> 95% and a ±5% precision level. In this case, the upper tail <strong>of</strong> thedistribution curve is <strong>of</strong> interest, and n 0 has a value <strong>of</strong> 271. 5= The required subpopulation size= The true population size.As shown by the formula, the minimum number <strong>of</strong> required containers depends on the truepopulation size.5.2-46

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!