12.07.2015 Views

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CH</strong>-<strong>TRAMPAC</strong> Document Rev. 2, May 2005Table 5.2-8 – Packaging-Specific DAC 3 Values (in Days) for Solid <strong>Waste</strong>(<strong>Waste</strong> Types II and III)................................................................................................ 5.2-29Table 5.2-9 – Wattage Limits for Theoretical Analysis <strong>of</strong> Design Pressure Limit .............. 5.2-36Table 5.2-10 – Decay Heat Criteria for Container Selection................................................ 5.2-40Table 5.2-11 – Maximum Allowable Total Gas Release Rates for <strong>Waste</strong> Type IV............. 5.2-44Table 5.2-12 – <strong>CH</strong>-TRU <strong>Waste</strong> Test Category Payload Container Data Sheet ................. 5.2-49Table 5.3-1 – Aspiration Times Based on Date <strong>of</strong> Drum Closure (<strong>Waste</strong> Type I ) ............. 5.3-3Table 5.3-2 – Aspiration Times Based on Date <strong>of</strong> Drum Closure(<strong>Waste</strong> Material Type II.1) ............................................................................................. 5.3-5Table 5.3-3 – Aspiration Times Based on Date <strong>of</strong> Drum Closure (<strong>Waste</strong> Type III )............ 5.3-7Table 5.3-4 – Aspiration Times Based on Container Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Type I )............................................................................... 5.3-9Table 5.3-5 – Aspiration Times Based on Container Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Material Type II.1)............................................................ 5.3-13Table 5.3-6 – Aspiration Times Based on Container Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Type III ).......................................................................... 5.3-16Table 5.3-7 – Aspiration Times Based on Rigid Liner Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Type I )............................................................................. 5.3-21Table 5.3-8 – Aspiration Times Based on Rigid Liner Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Material Type II.1)............................................................ 5.3-25Table 5.3-9 – Aspiration Times Based on Rigid Liner Headspace Gas Samplingat Time <strong>of</strong> Venting (<strong>Waste</strong> Type III ).......................................................................... 5.3-29Table 5.3-10 – Aspiration Times (in Days) Based on Headspace Gas SamplingDuring Aspiration (<strong>Waste</strong> Type I ).............................................................................. 5.3-33Table 5.3-11 – Aspiration Times (in Days) Based on Headspace Gas SamplingDuring Aspiration (<strong>Waste</strong> Material Type II.1) ............................................................. 5.3-37Table 5.3-12 – Aspiration Times (in Days) Based on Headspace Gas SamplingDuring Aspiration (<strong>Waste</strong> Type III ) ........................................................................... 5.3-41Table 6.2-1 – Payload Container Transportation Certification Document (PCTCD),Analytical Category .................................................................................................... 6.2-14Table 6.2-2 – Payload Container Transportation Certification Document (PCTCD),Test Category .............................................................................................................. 6.2-16Table 6.2-3 – Overpack Payload Container Transportation Certification Document(OPCTCD) .................................................................................................................. 6.2-18Table 6.2-4 – Payload Assembly Transportation Certification Document (PATCD) ........ 6.2-24Table 6.2-5 – Site Control Checklist for Controlled Shipments ......................................... 6.2-27vii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!