12.07.2015 Views

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CH</strong>-<strong>TRAMPAC</strong> Document Rev. 2, May 2005each container must be a non-negative number less than or equal to 50,000 for thepayload to be eligible for shipment.• Payload Total Gas Release Rate Less Than or Equal to Limit Calculated in AccordanceWith Section 6.2.5 (Section 6.2.5): Payload total gas release rate limits apply only topayloads containing one or more <strong>Waste</strong> Type IV payload containers that exceed thepayload container total gas release rate limit specified in Table 5.2-11 <strong>of</strong> Section 5.2.The site Transportation Certification Official shall verify that the determined payloadtotal gas release rate is less than or equal to the appropriate payload total gas release ratelimit pursuant to the methodology defined in Section 6.2.5.• Bottom Weight Greater Than or Equal to Top Weight (Section 2.3) (TRUPACT-II Only):For the TRUPACT-II, the subtotal weight plus subtotal RSS weight error <strong>of</strong> the bottomlayer <strong>of</strong> seven 55-gallon drums, four 85-gallon drums, three 100-gallon drums, sevenpipe overpacks, one SWB, five 55-gallon drums in a TDOP, or four 85-gallon drums in aTDOP shall be greater than or equal to that <strong>of</strong> the top layer.• Total Weight plus RSS Error Less Than or Equal to Packaging Limit (Section 2.3): Thetotal measured payload weight plus the weight <strong>of</strong> the pallets, reinforcing plates, etc., plusthe total RSS weight error shall be less than or equal to 7,265 lbs. for TRUPACT-IIpayloads or 7,600 lbs. for HalfPACT payloads.• Decay Heat plus RSS Error Less Than or Equal to Packaging Decay Heat Limit(Section 5.2.3): The total measured decay heat value plus the total RSS decay heat errorshall be less than or equal to the design limit for the packaging. The design limit for theTRUPACT-II is 40 watts; the design limit for the HalfPACT is 30 watts.• Fissile Mass (Pu-239 FGE) plus RSS Error Less Than or Equal to Payload Limit(Section 3.1): The total measured fissile mass (Pu-239 FGE) plus the total RSS fissilemass error shall be less than or equal to the maximum allowable fissile mass limitestablished for the payload configuration and waste contents.• Total Activity plus Error for S100 or S300 Pipe Overpack Payloads Less Than or Equalto 406 Curies (Section 3.3): The total activity for a payload assembly made up <strong>of</strong> S100or S300 pipe overpacks plus the error (i.e., one standard deviation) shall be less than orequal to 406 Ci. There is no activity limit for other payloads.Transportation Certification Official (Section 1.6)The site Transportation Certification Official shall verify that all <strong>of</strong> the requirements for theabove transportation parameters are met as stated in this document. The site TransportationCertification Official shall sign and date the PATCD upon verifying that the <strong>CH</strong>-<strong>TRAMPAC</strong>transportation requirements are met and the payload is qualified for transport. If therequirements are not met, the payload is rejected (payload may be reconfigured and reevaluatedagainst the payload requirements in this document).6.2-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!