12.07.2015 Views

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CH</strong>-<strong>TRAMPAC</strong> Document Rev. 2, May 2005Table 6.2-4 – Payload Assembly Transportation Certification Document(PATCD) Shipment #: _____________________________IDENTIFICATION PARAMETERSPayload Assembly Designated for Controlled Shipment? ◦ YES ◦ NOShipping Category :Decay Heat Limit :Hydrogen/Flammable Gas Generation Rate Limit :Packaging OCA Body/Lid #: ____________________________Type <strong>of</strong> Payload: 55-Gallon Drums Standard Pipe Overpacks S100 Pipe Overpacks S200 Pipe Overpacks 85-Gallon Drums SWBs S300 Pipe Overpacks 100-Gallon Drums TDOPTransportation Packaging: TRUPACT-II HalfPACTDate ICV Closed: ________________________________Time ICV Closed:BOTTOM PAYLOAD ASSEMBLY COMPOSITIONContainer IDWeight(lbs.)Error(lbs.)Decay Heat(watts)Error(watts)Fissile Mass(FGE)2x Error(FGE)Hydrogen/FlammableGas Generation Rate FlammabilityIndex Subtotal (A)Subtotal RSSError (C)Container IDTOP PAYLOAD ASSEMBLY COMPOSITION (TRUPACT-II Only)Weight(lbs.)Error(lbs.)Decay Heat(watts)Error(watts)Fissile Mass(FGE)2x Error(FGE)Hydrogen/FlammableGas Generation Rate FlammabilityIndex Subtotal (B)Subtotal RSSError (D)6.2-24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!