12.07.2015 Views

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

CH-TRAMPAC - Waste Isolation Pilot Plant - U.S. Department of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CH</strong>-<strong>TRAMPAC</strong> Document Rev. 2, May 2005Table 6.2-6 – WIPP Control Checklist for Controlled Shipments Shipment No. ________________________Packaging No.________________________To be completed by designated WIPP Operations personnel for each package designatedas a controlled shipment:<strong>CH</strong>-<strong>TRAMPAC</strong>Section No.ActivityRecordedDateRecordedTimeCompletion <strong>of</strong>Activity(Indicate bycheckmark [√])6.2.3.5Record date and time thatthe package arrives at WIPP6.2.3.6Vent package within 24hours <strong>of</strong> date and timerecorded above and recordvent date and timeI certify that the above data is accurate and compliant with the Unloading Timelimit <strong>of</strong> 24 hours, as specified in Section 6.2.3 <strong>of</strong> the <strong>CH</strong>-<strong>TRAMPAC</strong>.6.2.3.7__________________________________________________ / _________WIPP OPERATIONS PERSONNELDATENote: Controlled shipments (10 days) shall be made in accordance with the conditions specified in Appendix 3.6 <strong>of</strong>the <strong>CH</strong>-TRU Payload Appendices 1 and Section 6.2.3. This table may be reformatted for WIPP use provided that thesame information is recorded.6.2-28

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!