12.07.2015 Views

U.S. Navy Ship Salvage Manual Volume 6 - Oil Spill Response

U.S. Navy Ship Salvage Manual Volume 6 - Oil Spill Response

U.S. Navy Ship Salvage Manual Volume 6 - Oil Spill Response

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S0300-A6-MAN-060Figure 4-4. Boom Connecting Hardware.4-2.3.4 Magnetic Connectors. Magnetic connectors are attached to ships’ hulls or piers to holdthe boom end connection. The connectors move with the ship as the tide changes, but must bemoved when attached to a fixed object.4-2.3.5 Deployment and Recovery Accessories. Deployment and recovery accessories aid inquick boom deployment and protection when moving between land and water. Boom storage anddeployment units protect the boom in storage and have roller assemblies that allow easing theboom out with little chafing. Hydraulic or pneumatic storage reels deploy and recover boom at4-9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!