12.07.2015 Views

Regulatory and policy options to encourage development of ...

Regulatory and policy options to encourage development of ...

Regulatory and policy options to encourage development of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUSTAINABLE ENERGY REGULATION AND POLICYMAKING TRAINING MANUALpage 9.84<strong>of</strong> electric power, allowing VRA <strong>to</strong> export electricity <strong>to</strong> Compagnie Ivoirienned’Électricité (CIE) <strong>of</strong> Côte d’Ivoire <strong>and</strong> Communaté Électrique du Bénin (CEB) <strong>of</strong>Togo <strong>and</strong> Benin. However, as dem<strong>and</strong> grew within Ghana, the country began <strong>to</strong>face an electricity deficit. VRA now augments electric power supply by buying fromCôte d’Ivoire, which has exp<strong>and</strong>ed its generation capacity. VRA imports up <strong>to</strong> 250 MW<strong>of</strong> power from Côte d’Ivoire, <strong>and</strong> transmits power onwards <strong>to</strong> Togo <strong>and</strong> Benin.Power purchases from CIE have been mixed, with VRA having <strong>to</strong> import morepower during times <strong>of</strong> crises, for example, during the 1998 drought, which led <strong>to</strong>a drastic fall in hydro-capacity from Akosombo. Table 2 below shows the source<strong>of</strong> power supply by VRA <strong>to</strong> the Ghanaian market in 2005.Table 1. Power supply <strong>to</strong> the Ghanaian electricity market by VRA in 2003 1Generation sourceElectricity generated (GWh)Hydro 3,884Thermal 2,015Purchased from CIE 940Total 6,839There is also some st<strong>and</strong>by generation capacity available. Notably, mining companyAnglogold-Ashanti has a 21 MW diesel plant at Obuasi, <strong>and</strong> the Tema OilRefinery operates a 6.5 MW diesel plant at Tema. The Volta Reservoir receivedsubstantially above-average inflows during 1999, enabling output from Akosombo<strong>and</strong> Kpong <strong>to</strong> be raised from 3,830 GWh in 1998 <strong>to</strong> 5,169 GWh in 1999. By 2003,the water level in the lake fell again <strong>to</strong> as low as 237 feet in July <strong>and</strong> about 247feet in November. The minimum operating level <strong>of</strong> the dam is 248 feet.1.2. Transmission <strong>and</strong> distributionVRA owns <strong>and</strong> operates the nationwide transmission system <strong>and</strong> the distributionsystem for northern Ghana. The distribution system in southern Ghana is managedby the Electricity Company <strong>of</strong> Ghana (ECG). As <strong>of</strong> December 2003, the existingtransmission network system comprised <strong>of</strong> 36 substations <strong>and</strong> approximately4,000 km <strong>of</strong> 161 KV <strong>and</strong> 69 KV lines. This includes 129 km <strong>of</strong> double-circuit 161 KVinterconnection <strong>to</strong> Togo <strong>and</strong> Benin. There is also a single 220 km circuit, being a225 KV inter-tie with Côte d’Ivoire’s transmission network. The distribution systemcomprises 8,000 km <strong>of</strong> sub-transmission lines, 30,000 km <strong>of</strong> distribution networkswith 22 bulk supply points <strong>and</strong> 1,800 MVA <strong>of</strong> installed transformer capacity.1VRA Annual Report, 2003.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!