12.07.2015 Views

RFP after pre bid meeting for selection of SDA - Directorate of ...

RFP after pre bid meeting for selection of SDA - Directorate of ...

RFP after pre bid meeting for selection of SDA - Directorate of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>RFP</strong> <strong>for</strong> Selection <strong>of</strong> <strong>SDA</strong> <strong>for</strong> Horticulture DepartmentANNEXURE 16: INFRASTRUCTURE TO BE PROVIDED BY THE RSDC AT THE STATE DATACENTER:The application needs to be hosted in the State Data Center <strong>of</strong> Rajasthan. The following hardware ands<strong>of</strong>tware items required to host the application at State Data Center shall be provided to the selectedBidder by the State Data CenterS. No Components Qty. (in Nos.)Hardware Available at RSDC1. Database Server (with latest version <strong>of</strong> Windows 8/ 1Redhat Linux 6.0 Server Edition)2. Application Server (with latest version <strong>of</strong> Windows 8/ 1Redhat Linux 6.0 Server Edition)3. Web Server (with latest version <strong>of</strong> Windows 8/ Redhat 1Linux 6.0 Server Edition)4. SAN Storage (5 TB) 1S<strong>of</strong>tware Available at RSDC5. Database Server- Enterprise Edition (Latest version <strong>of</strong> 1MS SQL/ Postgre SQL/ Oracle)6. Application Server (IIS/ JBoss/ Apache Tomcat) 17. Web Server (Support .NET/ J2EE Plat<strong>for</strong>ms) 1Please Note:i. The <strong>bid</strong>ders shall proposal their technical solution in accordance with the availability <strong>of</strong>hardware and system s<strong>of</strong>tware at the Rajasthan State Data Center (RSDC)ii.iii.Other items like antivirus, EMS license, LAN Cabling and switches shall be provided to the<strong>bid</strong>der by RSDCOracle application will be available on shared basisThe above mentioned items are the minimum requirements and the successful <strong>bid</strong>der has to supply,install, integrate, test and commission any other equipment/ s<strong>of</strong>tware that is required <strong>for</strong> thesmoother functioning <strong>of</strong> the project but is not mentioned in the bill <strong>of</strong> material and at the time <strong>of</strong> <strong>bid</strong>submission, the <strong>bid</strong>der may append all such additional items to the financial <strong>bid</strong>s119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!