FY 10-11 ACCOMPLISHMENTS<br />
• Performed evaluation <strong>of</strong> road system to prioritize 150<br />
miles that will make the most efficient use <strong>of</strong> limited<br />
federal funding dollars based on traffic volume, regional<br />
significance and federal eligibility.<br />
• The following major road projects were constructed, under<br />
construction or in design and permitting in FY 10-11:<br />
River Road at Hilton Slide, Annapolis Road Bridge over<br />
Gualala River, Adobe Road at East Washington<br />
Intersection Improvements, Laughlin Road Bridge over<br />
Mark West Creek, Porter Creek Road Bridge over Porter<br />
Creek, Geysers Road Bridge over Big Sulphur Creek,<br />
Hwy 116 at Mirabel Road Intersection Improvements,<br />
Arnold Dr. Shoulder Widening, Hwy 12 Redevelopment<br />
Phase II Stage II, Signalization <strong>of</strong> Sebastopol Road at<br />
Burbank Ave, Signalization <strong>of</strong> Airport Blvd and Fulton<br />
Road, and Western Avenue Improvements.<br />
• The department and the city <strong>of</strong> Napa were successful in<br />
obtaining a joint Climate Initiative grant to develop and<br />
promote technologies that minimize green house gas<br />
emissions for road maintenance by piloting a cold-in-place<br />
recycling (CIR) project.<br />
• The Airport Division completed the renovations and<br />
expansion <strong>of</strong> the Airport passenger terminal and certain<br />
runways reconstruction.<br />
• Created and implemented an Airport Volunteer program to<br />
staff an Airport information booth in the Passenger<br />
Terminal<br />
• Began using the leachate pipeline on September 23, 2010,<br />
transferring leachate to the Laguna Wastewater Treatment<br />
Plant reducing trucking and the associated greenhouse gas<br />
emissions.<br />
• Completed the installation <strong>of</strong> a new landfill gas flare at the<br />
Central Disposal Site which will comply with state and<br />
federal air emissions regulations.<br />
• On September 8, 2010, resumed landfill operations at the<br />
Central Disposal Site for up to 150,000 tons per year <strong>of</strong><br />
solid waste and began work to re-permit the site.<br />
• Completed installation and activation <strong>of</strong> enhanced air<br />
monitoring network with real-time data availability.<br />
• Implemented Low Emission School Bus grant program to<br />
replace older, dirty school buses in the District with new,<br />
clean technology.<br />
• Despite reduced sales-tax funding maintained FY 09-10<br />
level <strong>of</strong> service and increase ridership an estimated 6%<br />
from 1,265,817 to 1,342,692 passengers.<br />
<strong>County</strong> <strong>of</strong> <strong>Sonoma</strong><br />
FY <strong>2011</strong>-<strong>2012</strong> <strong>Adopted</strong> <strong>Budget</strong><br />
167<br />
TRANSPORTATION AND PUBLIC WORKS<br />
Phillip Demery, Director<br />
FY 11-12 OBJECTIVES<br />
• Develop a pavement preservation plan for the 150 miles<br />
<strong>of</strong> priority roads.<br />
• Implement a new departmental cost accounting system<br />
that will integrate with the new countywide financial<br />
system.<br />
• Complete <strong>of</strong>fice space consolidation and review potential<br />
for future road yard consolidations.<br />
• Introduce new “low-floor” minibuses on local routes<br />
serving Sebastopol, Windsor and Cloverdale.<br />
• Work with MTC on a regional basis to prepare for <strong>2012</strong><br />
implementation <strong>of</strong> Clipper, the Bay Area transit fare<br />
smart card program.<br />
• Work with SMART and local entities to commence<br />
construction <strong>of</strong> the Cotati Intermodal and Healdsburg<br />
Intermodal facilities in summer <strong>2011</strong>.<br />
• Complete construction <strong>of</strong> a new natural gas fueling<br />
facility at the <strong>Sonoma</strong> <strong>County</strong> Transit yard.<br />
• Deploy electrical vehicle charging network in<br />
collaboration with <strong>County</strong> Fleet Operations and local<br />
cities.<br />
• Continue long-term planning for regional solution for<br />
solid waste and settling respective responsibility for<br />
unfunded liabilities between the county and cities.<br />
• Complete work necessary to permit additional capacity at<br />
the Central Disposal Site for continued landfill<br />
operations.<br />
• Construct facility improvements including tipping floor<br />
repairs or replacements at the Central, <strong>Sonoma</strong> and<br />
Healdsburg transfer stations.<br />
• Continue efforts to attract additional commercial airlines<br />
for service to non-Horizon Air destinations, expand<br />
Horizon Air services to include a third Los Angeles<br />
(LAX) flight and a daily flight to San Diego.<br />
• Complete the EIR for the Airport Master Plan<br />
• Enhance fish passages and protect endangered California<br />
Tiger Salamanders through multiple efforts such as the<br />
Burbank Pathway and Signal project.<br />
Development Services