FY 10-11 ACCOMPLISHMENTS<br />

• Performed evaluation <strong>of</strong> road system to prioritize 150<br />

miles that will make the most efficient use <strong>of</strong> limited<br />

federal funding dollars based on traffic volume, regional<br />

significance and federal eligibility.<br />

• The following major road projects were constructed, under<br />

construction or in design and permitting in FY 10-11:<br />

River Road at Hilton Slide, Annapolis Road Bridge over<br />

Gualala River, Adobe Road at East Washington<br />

Intersection Improvements, Laughlin Road Bridge over<br />

Mark West Creek, Porter Creek Road Bridge over Porter<br />

Creek, Geysers Road Bridge over Big Sulphur Creek,<br />

Hwy 116 at Mirabel Road Intersection Improvements,<br />

Arnold Dr. Shoulder Widening, Hwy 12 Redevelopment<br />

Phase II Stage II, Signalization <strong>of</strong> Sebastopol Road at<br />

Burbank Ave, Signalization <strong>of</strong> Airport Blvd and Fulton<br />

Road, and Western Avenue Improvements.<br />

• The department and the city <strong>of</strong> Napa were successful in<br />

obtaining a joint Climate Initiative grant to develop and<br />

promote technologies that minimize green house gas<br />

emissions for road maintenance by piloting a cold-in-place<br />

recycling (CIR) project.<br />

• The Airport Division completed the renovations and<br />

expansion <strong>of</strong> the Airport passenger terminal and certain<br />

runways reconstruction.<br />

• Created and implemented an Airport Volunteer program to<br />

staff an Airport information booth in the Passenger<br />

Terminal<br />

• Began using the leachate pipeline on September 23, 2010,<br />

transferring leachate to the Laguna Wastewater Treatment<br />

Plant reducing trucking and the associated greenhouse gas<br />

emissions.<br />

• Completed the installation <strong>of</strong> a new landfill gas flare at the<br />

Central Disposal Site which will comply with state and<br />

federal air emissions regulations.<br />

• On September 8, 2010, resumed landfill operations at the<br />

Central Disposal Site for up to 150,000 tons per year <strong>of</strong><br />

solid waste and began work to re-permit the site.<br />

• Completed installation and activation <strong>of</strong> enhanced air<br />

monitoring network with real-time data availability.<br />

• Implemented Low Emission School Bus grant program to<br />

replace older, dirty school buses in the District with new,<br />

clean technology.<br />

• Despite reduced sales-tax funding maintained FY 09-10<br />

level <strong>of</strong> service and increase ridership an estimated 6%<br />

from 1,265,817 to 1,342,692 passengers.<br />

<strong>County</strong> <strong>of</strong> <strong>Sonoma</strong><br />

FY <strong>2011</strong>-<strong>2012</strong> <strong>Adopted</strong> <strong>Budget</strong><br />

167<br />

TRANSPORTATION AND PUBLIC WORKS<br />

Phillip Demery, Director<br />

FY 11-12 OBJECTIVES<br />

• Develop a pavement preservation plan for the 150 miles<br />

<strong>of</strong> priority roads.<br />

• Implement a new departmental cost accounting system<br />

that will integrate with the new countywide financial<br />

system.<br />

• Complete <strong>of</strong>fice space consolidation and review potential<br />

for future road yard consolidations.<br />

• Introduce new “low-floor” minibuses on local routes<br />

serving Sebastopol, Windsor and Cloverdale.<br />

• Work with MTC on a regional basis to prepare for <strong>2012</strong><br />

implementation <strong>of</strong> Clipper, the Bay Area transit fare<br />

smart card program.<br />

• Work with SMART and local entities to commence<br />

construction <strong>of</strong> the Cotati Intermodal and Healdsburg<br />

Intermodal facilities in summer <strong>2011</strong>.<br />

• Complete construction <strong>of</strong> a new natural gas fueling<br />

facility at the <strong>Sonoma</strong> <strong>County</strong> Transit yard.<br />

• Deploy electrical vehicle charging network in<br />

collaboration with <strong>County</strong> Fleet Operations and local<br />

cities.<br />

• Continue long-term planning for regional solution for<br />

solid waste and settling respective responsibility for<br />

unfunded liabilities between the county and cities.<br />

• Complete work necessary to permit additional capacity at<br />

the Central Disposal Site for continued landfill<br />

operations.<br />

• Construct facility improvements including tipping floor<br />

repairs or replacements at the Central, <strong>Sonoma</strong> and<br />

Healdsburg transfer stations.<br />

• Continue efforts to attract additional commercial airlines<br />

for service to non-Horizon Air destinations, expand<br />

Horizon Air services to include a third Los Angeles<br />

(LAX) flight and a daily flight to San Diego.<br />

• Complete the EIR for the Airport Master Plan<br />

• Enhance fish passages and protect endangered California<br />

Tiger Salamanders through multiple efforts such as the<br />

Burbank Pathway and Signal project.<br />