12.07.2015 Views

AECOM Report B&W - N - City of Guelph

AECOM Report B&W - N - City of Guelph

AECOM Report B&W - N - City of Guelph

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

345.5C10-II D4-I MH 4SHighest Top <strong>of</strong> Sheet Pile Wall Elevation344.5343.5Difference (m)342.5Lowest Top <strong>of</strong> Sheet Pile Wall Elevation341.5Elevation <strong>of</strong> Pipe invert at M H 4 S340.5339.518-Jan1-Jan15-Dec28-Nov11-Nov25-Oct8-Oct21-Sep4-Sep18-Aug1-Aug15-Jul28-Jun11-Jun25-May8-May21-Apr4-Apr18-Mar1-Mar13-Feb27-Jan10-Jan24-Dec345.5C7-IMH 6SHighest Top <strong>of</strong> Sheet Pile Wall Elevation344.5343.5Difference (m)342.5Lowest Top <strong>of</strong> Sheet Pile Wall Elevation341.5340.5339.5Elevation <strong>of</strong> Pipe invert at M H 6S at 33 9 .5 mASL18-Jan1-Jan15-Dec28-Nov11-Nov25-Oct8-Oct21-Sep4-Sep18-Aug1-Aug15-Jul28-Jun11-Jun25-May8-May21-Apr4-Apr18-Mar1-Mar13-Feb27-Jan10-Jan24-DecEastview Road Landfill SiteWater Elevations in the South Collection SystemSelected Locations during 2008FIGURE980-13110c Rpt Water Level Comparison Along PLC21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!