13.07.2015 Views

phase 4 report - DNV

phase 4 report - DNV

phase 4 report - DNV

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RN04: ESCAPE, EVACUATION AND RESCUE OF PEOPLE // Guidance on Creating Performance StandardsBarents 2020Survivability (S)S1 Arctic TEMPSC and stowage arrangements shallsurvive accident eventsInsert a statement (similar to that shown inF1 above)Insert a statement (similar to that shownin F1 above)Ref: HAZEER Study, doc't no. XXXXXS4Arctic TEMPSC shall survive all environmentaland installation hazards while transiting throughthe sea/ice within the hazard zone, e.g. pool firesetc.Insert a statement (similar to that shown inF1 above)Insert a statement (similar to that shownin F1 above)Ref: HAZEER Study, doc't no. XXXXXS6The bow of the IS-TEMPSC shall maintainintegrity (survive), being capable of resisting adirect or glancing impact load as a result ofstriking an ice floe at full speed.Ref: Project research results ZZZZInsert a statement (similar to that shown inF1 above)Insert a statement (similar to that shownin F1 above)Interdependencies (I)I1 Emergency response vessel (performance standards no. xxxxxx)I2 Emergency communications (performance standards no. xxxxxx)I3 Ice management for emergency evacuation (performance standards no. xxxxxx)I4 Medevac (performance standards no. xxxxxx)I5 Ice management (performance standards no. xxxxxx)Page 199 of 359Report no 2012-0690 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!