13.07.2015 Views

phase 4 report - DNV

phase 4 report - DNV

phase 4 report - DNV

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RN01: CO-ORDINATION OF DELIVERABLES // APPENDIXBarents 2020BARENTS 2020 PROJECT PHASE IVNew Work Item Proposal forISO TC67 Arctic International Standards DevelopmentNWIP2TITLE OF PROPOSALNew ISO Standard: Arctic Operations – Topside FacilitiesSCOPE OF PROPOSALTo make a stand-alone standard for topside oil & gas production facilities with amendments to existingstandards. See 2a, 2b, 2c and 2d as examples.Reference is also made to list of standards requiring modification for use in Arctic environment given inBarents 2020 <strong>report</strong> <strong>phase</strong>3.PURPOSE AND JUSTIFICATIONISO 19906 “Arctic Structures” is covering arctic operation specific additional requirements to existingstructural ISO TC67 standards. Similarly an “Arctic topsides” standards could be a collection of arcticoperation specific additional requirements for topsides systems and installations.RELEVANT DOCUMENTS TO BE CONSIDERED• ISO 19906• Guidance document from Barents 2020, planned end 2011.Report no 2012-0690 281

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!