02.12.2012 Views

AC TRANSIT DISTRICT GM Memo No. 09-217d Board of Directors ...

AC TRANSIT DISTRICT GM Memo No. 09-217d Board of Directors ...

AC TRANSIT DISTRICT GM Memo No. 09-217d Board of Directors ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Line<br />

26<br />

Revised<br />

proposal<br />

Change in Routing<br />

Change in<br />

Hours <strong>of</strong> Operation<br />

Change in<br />

Frequency<br />

All or Portion<br />

Discontinued<br />

New or Restored<br />

Line<br />

X X<br />

Revised Service Adjustments Plan (RevSAP)<br />

Description<br />

Change from the August proposal: hours <strong>of</strong> operation would<br />

be extended from 5 a.m. to midnight every day. Frequency<br />

during commute period would be improved to 15 minutes.<br />

Hours <strong>of</strong><br />

Operation<br />

(approximate)<br />

Frequency<br />

As <strong>of</strong>: <strong>No</strong>vember 19, 20<strong>09</strong><br />

Weekday Weekend<br />

Hours <strong>of</strong><br />

Operation Frequency<br />

(approximate)<br />

5am–midnight 15–30 5am–midnight 30<br />

August<br />

proposal<br />

X<br />

New line would operate from Alameda Ferry Terminal to<br />

Emeryville Amtrak via Main St., Lexington St., W. Midway Ave.,<br />

Atlantic Ave. (Ralph Appezzato <strong>Memo</strong>rial Pkwy.), Challenger Dr.,<br />

Marina Village Pkwy., and downtown Oakland. Weekdays only,<br />

service continues to 10th St., West Oakland BART, Peralta St.,<br />

and Shellmound St.<br />

Routing would change from the August proposal. Line 31<br />

would operate from Pan Am Way and W. Midway Ave. to<br />

6am–10pm 30 6am–10pm 30<br />

31<br />

Powell Plaza in Emeryville via W. Midway Ave., Main St.,<br />

Pacific Ave., Marshall Way, Lincoln Ave., Webster St.,<br />

Revised<br />

proposal<br />

X X X<br />

Challenger Dr., Marina Square Parkway, downtown Oakland,<br />

10th St., West Oakland BART, Peralta St., Hollis St., and<br />

Shellmound St. to Christie St. <strong>No</strong> service to Emeryville<br />

Amtrak, Ralph Appezzato <strong>Memo</strong>rial Parkway west <strong>of</strong><br />

Webster St., the Alameda Ferry Terminal, or Alameda Point<br />

other than W. Midway Ave. Service would operate every day<br />

along the entire line.<br />

6am–10pm 30 6am–10pm 30<br />

39<br />

Revised<br />

proposal<br />

X<br />

New line would operate from Fruitvale BART to Skyline High<br />

School via Fruitvale Ave., MacArthur Blvd., Lincoln Ave., 6:30am–8:00pm<br />

Joaquin Miller Ave., and Skyline Blvd.<br />

Weekend service would be discontinued on Bancr<strong>of</strong>t Ave.<br />

60 – –<br />

August<br />

proposal<br />

X X<br />

Weekend frequency would be reduced from 8–20 to 15–30 mins.<br />

See Line 89 for weekend service between Dutton Ave. and Bay<br />

5am–midnight 10–20 5am–midnight 15–30<br />

40<br />

Fair BART.<br />

Revised<br />

proposal<br />

X<br />

Line 40 would continue at today's hours <strong>of</strong> operation,<br />

routing, and frequency, with none <strong>of</strong> the changes that had<br />

been proposed.<br />

5am–midnight 10/20 5am–midnight 10/20<br />

41 . X Line would be discontinued.<br />

Line would be extended from Coliseum BART to Eastmont<br />

– – – –<br />

45<br />

August<br />

proposal<br />

X X<br />

Transit Center along San Leandro Blvd., Seminary Ave., Hillmont<br />

Dr., and 73rd Ave., incorporating segments <strong>of</strong> former Line 56.<br />

Service after 10pm would be discontinued.<br />

6am–10pm 15–30 6am–10pm 30<br />

Revised<br />

proposal<br />

X<br />

Change from the August proposal: hours <strong>of</strong> operation would<br />

5am–midnight<br />

be extended from 5:00 am to midnight every day.<br />

15–30 5am–midnight 30<br />

Page 4 <strong>of</strong> 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!