13.07.2015 Views

2012 Full-year results: Presentation - Unibail-Rodamco

2012 Full-year results: Presentation - Unibail-Rodamco

2012 Full-year results: Presentation - Unibail-Rodamco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

42STRONG GROWTH AHEADCentrum Cerny Most extension, PragueOpening in March 2013Total GLA after extension: 81,340 m²TIC: €150 MnAlma extension, RennesOpening in September 2013Total GLA after extension: 45,905 m²TIC: €96 MnToison d’Or extension, DijonOpening in October 2013Total GLA after extension: 70,184 m²TIC: €85 Mn• Shopping centre projects to be delivered in 2013 already 70% pre-let (1)• 3 major extensions and renovations to be delivered in 2013 strengthening the appeal of the existing malls

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!