Condition 25: Charges <strong>for</strong> Connection to and use of the Licensee's System1. The Licensee shall:(a)as soon as practicable and in any event within 3 months after the date uponwhich this Licence is granted, prepare statements in relation to the Licensee's<strong>Transmission</strong> System in such <strong>for</strong>m as shall have been approved by the<strong>Authority</strong>, setting out the basis upon which the charges <strong>for</strong> each of:(i)(ii)Connection to the Licensee's <strong>Transmission</strong> System; anduse of the Licensee's <strong>Transmission</strong> System,will be made, with such detail as shall be necessary to enable any Person tomake a reasonable estimate of the charges to which he would become liable <strong>for</strong>the provision of any such service and (without prejudice to the <strong>for</strong>egoing)including the in<strong>for</strong>mation set out in paragraphs 2 or 3 below, as appropriate;(b)(c)update the statements referred to in paragraphs (a)(i) and (a) (ii) above annuallyor as may otherwise be required by the <strong>Authority</strong> from time to time; andensure that the statements prepared as provided at paragraphs (a)(i) and (a)(ii),any updates thereof prepared in accordance with paragraph (b) and the chargesto which each of those statements and/or updates refer are consistent in allrespects with the provisions of Schedule 2.2. The statement referred to in paragraph 1(a)(i) shall include:(a)(b)(c)a schedule listing those items (including the carrying out of works and theprovision and installation of Electric Lines or meters (as appropriate)) liable to berequired <strong>for</strong> the purpose of Connection (at entry or exit points) to the Licensee's<strong>Transmission</strong> System <strong>for</strong> which Connection charges may be made or levied andincluding (where practicable) indicative charges <strong>for</strong> each such item and (in othercases) an explanation of the methods by which and the principles on which suchcharges will be calculated;the methods by which and the principles on which any charges will be made inrespect of extension or rein<strong>for</strong>cement of the Licensee's <strong>Transmission</strong> Systemrendered (in the Licensee's discretion) necessary or appropriate by virtue ofproviding Connection to or use of System to any Person seeking Connection;the methods by which and the principles on which Connection charges will bemade in circumstances where the Electric Lines or other plant (as appropriate) tobe installed are (at the Licensee's discretion) of greater size or capacity than thatrequired <strong>for</strong> use of System by the Person seeking Connection;<strong>Oman</strong> <strong>Electricity</strong> <strong>Transmission</strong> <strong>Company</strong> SAOC Licence 1-May-2005 Page - 39 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!