Oman Electricity Transmission Company S.A.O.C - Authority for ...
Oman Electricity Transmission Company S.A.O.C - Authority for ...
Oman Electricity Transmission Company S.A.O.C - Authority for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Condition 27: <strong>Transmission</strong> System capability statement1. The Licensee shall, on an annual basis, prepare a statement, in a <strong>for</strong>m approved by the<strong>Authority</strong>, showing, in respect of each of the five (5) succeeding financial years, circuitcapacity, <strong>for</strong>ecast power flows and loading on each part of the <strong>Transmission</strong> System andfault levels <strong>for</strong> each transmission node, together with:(a)(b)(c)(d)(e)(f)in<strong>for</strong>mation on the status of <strong>Transmission</strong> capacity and the anticipated futurerequirements of <strong>Transmission</strong> capacity, including (a) new <strong>Transmission</strong> Systemload and (b) New Capacity;a commentary prepared by the Licensee indicating the Licensee's views as tothose parts of the <strong>Transmission</strong> System most suited to new Connections andtransport of further quantities of electricity, including <strong>for</strong> New Capacity andConnection of Systems operated by the Rural Areas <strong>Electricity</strong> <strong>Company</strong> SAOC;in<strong>for</strong>mation on what constraints are <strong>for</strong>eseen on the <strong>Transmission</strong> System andwhere;in<strong>for</strong>mation relating to progress of ongoing investment in the <strong>Transmission</strong>System;such further in<strong>for</strong>mation as shall be reasonably necessary to enable any Personseeking use of System to identify and evaluate the opportunities available whenConnecting to and making use of the <strong>Transmission</strong> System; andsuch other matters as shall be specified in directions issued by the <strong>Authority</strong>from time to time <strong>for</strong> the purposes of this Condition,provided that the <strong>Authority</strong> may, upon application of the Licensee, relieve the Licenseefrom the obligation to prepare any such statement in respect of any period and any partor parts of the <strong>Transmission</strong> System specified in directions issued to the Licensee by the<strong>Authority</strong> from time to time <strong>for</strong> the purposes of this Condition.2. The Licensee shall include in every statement given or sent under paragraph 1 thein<strong>for</strong>mation required by that paragraph except that the Licensee may with the priorconsent of the <strong>Authority</strong> omit from any such statement any details as to the capacity,flows, loading or other in<strong>for</strong>mation, disclosure of which would, in the view of the<strong>Authority</strong>, seriously and prejudicially affect the commercial interests of the Licensee orany third party.<strong>Oman</strong> <strong>Electricity</strong> <strong>Transmission</strong> <strong>Company</strong> SAOC Licence 1-May-2005 Page - 44 -