13.07.2015 Views

Oman Electricity Transmission Company S.A.O.C - Authority for ...

Oman Electricity Transmission Company S.A.O.C - Authority for ...

Oman Electricity Transmission Company S.A.O.C - Authority for ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3. The Licensee shall, when preparing the statement referred to in paragraph 1 of thisCondition, ensure that the <strong>for</strong>ecasts of electricity flows and loading on each part of the<strong>Transmission</strong> System are consistent with the prevailing electricity demand <strong>for</strong>ecastsprepared and used by the PWP <strong>for</strong> the purposes of the statement of future capacityrequirements required by Condition 5 of the PWP licence.4. The Licensee shall, when preparing the statement referred to in paragraph 1 of thisCondition, ensure that the statement takes due account of in<strong>for</strong>mation required to beprovided to it by Persons bound by the Grid Code.5. The Licensee may periodically revise the in<strong>for</strong>mation set out in and, with the approval ofthe <strong>Authority</strong>, alter the <strong>for</strong>m of the statement prepared in accordance with paragraph 1and shall, at least once in every year this Licence is in <strong>for</strong>ce, revise such statement inorder that the in<strong>for</strong>mation set out in the statement shall continue to be accurate in allmaterial respects.6. The Licensee shall send a copy of the statement prepared in accordance with paragraph1 and of each revision of such statement in accordance with paragraph 3 to the<strong>Authority</strong>. Each such revision shall require to be approved by the <strong>Authority</strong> and shall notbecome effective until approved by the <strong>Authority</strong>.7. The Licensee shall, subject to paragraph 8, give or send a copy of the statementprepared in accordance with paragraph 1 or (as the case may be) of the latest revisionof such statement in accordance with paragraph 2 approved by the <strong>Authority</strong> pursuant tosuch paragraph to any Person who requests a copy of such statement.8. The Licensee may make a charge <strong>for</strong> any statement given or sent pursuant to paragraph7 of an amount reflecting the Licensee's reasonable costs of providing such a statementwhich shall not exceed the maximum amount specified in directions issued by the<strong>Authority</strong> from time to time <strong>for</strong> the purposes of this Condition.Condition 28: International Interconnections1. If the Licensee proposes to:(a)(b)enter into a new contract or arrangement <strong>for</strong> the Interconnection of its Systemwith a System which exists outside the Sultanate of <strong>Oman</strong>; ordevelop or make arrangements to develop a new International Interconnection,and, in either case, the proposed Interconnection will have a capacity of 33kV or more orsuch other capacity limit as may be determined in accordance with the Sector Law, thefollowing paragraphs shall apply.<strong>Oman</strong> <strong>Electricity</strong> <strong>Transmission</strong> <strong>Company</strong> SAOC Licence 1-May-2005 Page - 45 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!