Brunner USA Instructions - Robeys Ltd
Brunner USA Instructions - Robeys Ltd
Brunner USA Instructions - Robeys Ltd
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
COMMISSIONINGTurn the <strong>USA</strong> on, subsequently,the <strong>USA</strong> performs a self-test(approx. 1 min).During this time, the output willbe disabled, ie the ventilationsystem is off.This condition is indicated by theillumination of the green and thered LED.The self-test is repeated oncedaily to the time ofcommissioning.During the self-adaptation of theswitching, output is disabled. Inaddition, the measurement cell<strong>USA</strong> recalibrated to ensure aprecise measurement every 15minutes.This self-test recognizes two soft clack noise. When the red LED isoff, the <strong>USA</strong> is ready.The measurement of temperature and reduced pressure isperformed automatically.It needs no further action.<strong>Brunner</strong> <strong>USA</strong> Installation & Operation Manual 14August 2013