13.07.2015 Views

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FUNCTION TEST AND MAINTENANCEWhen the <strong>USA</strong> responded:<strong>USA</strong> constantly monitors the temperature of the flue pipe, theoperating status is indicated by the green LED. If the temperaturerises above 50 ° C (default), a burn is detected, the green LEDstarts to flash, from here the vacuum of the chimney is monitored.In order to ensure a safe exit of flue gases a comparison betweenthe room and the flue must be made, there must be a vacuum ofat least 4 Pascal.An exhaust hood or a controlled living space ventilation canproduce much higher vacuum, the subsequent flow of air isprevented by the modern, tight construction. To prevent backflow ofexhaust gas into the room, <strong>USA</strong> must stop the fan, in this case:the red LED will light and the ventilation system will be switchedoff.Function test:To test the function of the <strong>USA</strong>, connect the power and the vacuumsensor (green LED illuminated).The temperature sensor must reach approximately 50°C (greenLED flashes) (value in delivery state).Hold the vacuum hose into the room (do not connect to thechimney and not blow into it). Within about 30 seconds, the <strong>USA</strong>should shutdown (red LED lights).<strong>Brunner</strong> <strong>USA</strong> Installation & Operation Manual 21August 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!