13.07.2015 Views

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The vacuum circuit breaker safety (<strong>USA</strong>) is in compliance with thebasic maintenance measures in accordance with DIN 31 051 inconjunction. DIN EN 13 306 to maintain operation by a specialist.The home owner must test the <strong>USA</strong> at least once a month.Turn off the power to the <strong>USA</strong> ( the ventilation system / hood willstop working ), when the power is turned on again the <strong>USA</strong> willreturn to normal start up.Check the pressure compensation opening / s for blockage andclean if necessary.Check the screws of the mounting of the sensor and retighten ifnecessary.Check the pressure gauge line for blockage and clean if necessary.Check the correct position of the clamp and seal the flue andcorrect if necessary.Contaminants in the flue delay the response time of thetemperature sensor!<strong>Brunner</strong> <strong>USA</strong> Installation & Operation Manual 22August 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!