13.07.2015 Views

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

Brunner USA Instructions - Robeys Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Status indicators:StatusdisplayMeaningStatusdisplayMeaning0 Switch 1 TW - Delay2 Temperature monitoring 3 Pressure monitoring4 Delay 5 TA - Delay6 Troubleshooting 7 Troubleshooting confirmedwith key8 - 13 ZeroingSetting values and their meanings:Description Abbr. Range Factorysetting )*Pressure limit dp_soll 4 Pa - 20 Pa 4 PaUp Time Tw 1 min - 30 min 1 minDelay for switching off whilebelow the boundaryWaiting time betweenshutdown and re-checkingTemperature for activation ofthe pressure monitoringsystemTv 1 sec - 30 sec 20 secTa 1 min - 30 min 15 minTemperature 20°C - 100°C 50 °C) * Value in delivery stateDuring commissioning, the set values are to be checked and in thefollowing table entered. The <strong>USA</strong> must be tested with the enteredvalues and put into operation are. With these changes are to taketo the table.<strong>Brunner</strong> <strong>USA</strong> Installation & Operation Manual 17August 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!