13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

March 2, 2011Reference: 006-189Stantec Consulting Ltd.49 Frederick StreetKitchener, Ontario N2H 6M7Attention: Mr. Roger FreymondSubject:K15 Pump Removal and Well AssessmentThis memo as been prepared to document the work performed at <strong>Region</strong> <strong>of</strong> <strong>Waterloo</strong> Well K15located in Kitchener Ontario. The work program included removal <strong>of</strong> an existing submersiblepump, calliper log and well video to determine requirements for abandonment. The pump wasremoved on February 8 th, 2011, the video was performed on February 10 th and the calliper log onFebruary 22 nd .Pump RemovalA three stage 175mm submersible pump fitted to a 25hp motor was found set on 30m <strong>of</strong> 100mmsteel column pipe. Based on motor serial numbers the equipment was likely installed new in1991. The equipment is in poor condition.Video Survey ResultsA video survey was conducted to determine the depths <strong>of</strong> significant well features, and toconfirm the well was free <strong>of</strong> foreign objects and blockages. Details <strong>of</strong> the video can be found inthe attached Table 1 and a DVD is enclosed with the original hardcopy <strong>of</strong> this report.- The hole was found open and unobstructed to 96.5m.- The video survey revealed a substantial amount <strong>of</strong> buildup on the casing as seen in Photo1. The buildup made it impossible to confirm the exact depth <strong>of</strong> the bottom <strong>of</strong> the casing,but historical records indicate a depth <strong>of</strong> 53.3 m (175’).- The primary well feature is a cavernous section which starts at 58.0 m – 60.9 m (190’ –200’). This section is shown in Photo 2 along with a scrap piece <strong>of</strong> wire which is hung upacross this feature.- A 1m section <strong>of</strong> pipe was discovered at the bottom <strong>of</strong> the well as shown in Photo 3 and4.Caliper LogA caliper log was conducted <strong>of</strong> the well to confirm the well construction and can be found inFigure 1. The log confirms a total depth <strong>of</strong> 96.5m which is similar to the 97m depth reported the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!