13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 8a – Existing ConditionsWell K18 (53 l/s) Pump Start-up: 30 Seconds (Head Envelope)Figure 8b – Existing ConditionsWells K18 (53 l/s) Pump Start-up: 30 Seconds (Pressure Envelope)Head Legend:Pipeline ElevationInit. Conditions HeadMax. Transient HeadMin. Transient HeadVapour HeadPressure Legend:Transmission MainInit. Conditions Press.Max. Transient Press.Min. Transient Press.Vapour Press.Client / ProjectFigure No.TitleStrange Street Water Supply System.Transient Analysis8a & 8bExisting ConditionsScenario 6: Start-up Well K18 (30 Seconds)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!