13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 3a – Existing ConditionsPump Shutdown – Wells K10A, K11, K13, K18, & K19 (136 l/s): Power Failure (Head Envelope)Figure 3b – Existing ConditionsPump Shutdown – Wells K10A, K11, K13, K18, & K19 (136 l/s): Power Failure (Pressure Envelope)Head Legend:Pipeline ElevationInit. Conditions HeadMax. Transient HeadMin. Transient HeadVapour HeadPressure Legend:Transmission MainInit. Conditions Press.Max. Transient Press.Min. Transient Press.Vapour Press.Client / ProjectFigure No.TitleStrange Street Water Supply System.Transient Analysis3a & 3bExisting ConditionsScenario 1: Shutdown All Wells (power failure)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!