13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 9a – Existing System w/Combination Air Valves and Pressure Sustaining ValveWell K18 (53 l/s) Pump Shutdown: 60 Seconds (Head Envelope)Figure 9b – Existing System w/Combination Air Valves and Pressure Sustaining ValveWell K18 (53 l/s) Pump Shutdown: 60 Seconds (Pressure Envelope)Head Legend:Pipeline ElevationInit. Conditions HeadMax. Transient HeadMin. Transient HeadVapour HeadPressure Legend:Transmission MainInit. Conditions Press.Max. Transient Press.Min. Transient Press.Vapour Press.Client / ProjectFigure No.TitleStrange Street Water Supply System.Transient Analysis9a & 9bExisting System w/Air Valves and PSVScenario 7: Shutdown Well K18 (60 seconds)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!