13.07.2015 Views

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

Sam Ziemann From - Region of Waterloo

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HYDROGEOLOGICAL ASSESSMENTSTRANGE STREET WATER SUPPLY CLASS EA UPDATEREGIONAL MUNICIPALITY OF WATERLOO1.0 IntroductionThe <strong>Region</strong>al Municipality <strong>of</strong> <strong>Waterloo</strong> (<strong>Region</strong>) is undertaking the Strange Street Water SupplySystem Class Environmental Assessment (Class EA) Update. The primary objective <strong>of</strong> thisstudy is to update the Class EA and Preliminary Design completed by the <strong>Region</strong> in 2001, withthe first component <strong>of</strong> this study focusing on groundwater investigations. Since 2001, a variety<strong>of</strong> work has been conducted in the Strange Street Well Field (Figure 1), including wellrehabilitation and assessment efforts, and the installation <strong>of</strong> two (2) new production wells(Production Wells K11A and K19) (Stantec, 2005; Burnside, 2007). In addition, recent work hasbeen completed by the Ontario Geological Survey (OGS) (Bajc and Shirota, 2007) and Stantec(2009) consisting <strong>of</strong> a detailed review <strong>of</strong> the hydrostratigraphy <strong>of</strong> the <strong>Waterloo</strong> Moraine andbedrock units throughout the <strong>Region</strong>, which resulted in a detailed update <strong>of</strong> thehydrostratigraphy within the Strange Street Well Field (Stantec, 2009).The <strong>Region</strong> retained Stantec Consulting Ltd. (Stantec) to complete the hydrogeologicalassessment related to the Class EA Update which was broken down into the followingobjectives:• Assess historical and current water quality data and production well performance data withinthe Strange Street Well Field supply aquifer;• Review and assess existing groundwater data to identify potential test drilling locations;• Construction <strong>of</strong> monitoring wells and test wells at up to two (2) preferred test drillinglocations; and• Performance testing and groundwater sampling <strong>of</strong> the new test well(s).This report has been organized into seven sections, including this introduction (Section 1.0).Section 2.0 provides a background summary <strong>of</strong> the well field geology and hydrogeology.Methodologies are presented in Section 3.0 with results presented in Section 4.0. Conclusionsand recommendations are presented in Sections 5.0 and 6.0, respectively with reportreferences presented in Section 7.0.All figures and tables referenced throughout the report are presented in Appendices A and B,respectively. Lotowater Technical Services Inc. (Lotowater) well performance reports areprovided in Appendix C. Technical Memorandums A1 and A2 are presented in Appendix D andE, respectively. The residential notification letter is presented in Appendix F. Test well,monitoring well logs, and water well records are presented in Appendix G. A copy <strong>of</strong> the PTTWand application package is provided in Appendix H. Appendices I though L presentAQTESOLV TM Analysis, Laboratory Certificates <strong>of</strong> Analysis, letter <strong>of</strong> compliance, and the riskassessment related to discharge water quality, respectively.hls v:\01609\active\161110897_strange_st\planning\report\final hydrogeo assessment\final\fnl_rpt_120319.docx 1.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!